Newmont Mining Corporation <br /> Cripple Creek&Victor Gold Mine ■ <br /> VLF2 Phase 2 CCw <br /> NewFields Job No.475.0106.032 <br /> Week Ending Saturday,June 15,2019 <br /> 2.5 Geomembrane Acceptance <br /> No geomembrane was accepted during this week. <br /> 3.0 STORM WATER MANAGEMENT <br /> Best Management Practices continue to be performed. <br /> 4.0 NEWFIELDS LABORATORY ACTIVITIES <br /> NewFields personnel performed sieve analysis, atterberg limits, compaction, and permeability <br /> testing. The following samples were collected for laboratory testing: <br /> ➢ Soil Liner Fill: NFSLF-80-C, NFSLF-81-C (Tezak Stockpile) <br /> ➢ Soil Liner Fill: NFSLF-82-R, NFSLF-83-R (Phase 2A VLF) <br /> Leak Detection Fill: NFLDF-4-R <br /> 5.0 MEETINGS AND COMMUNICATIONS <br /> NewFields personnel attended the VLF2 weekly construction meeting (June 11, 2019) and <br /> Tezak's daily safety meetings. <br /> 6.0 MISCELLANEOUS, ISSUES, AND CONCERNS <br /> NewFields, Tezak, Newmont, and Tetra Tech personnel discussed and developed a punch list of <br /> items needing to be address prior to approval of geomembrane. <br /> It was understood by Tezak, Tetra Tech, and Newmont that panel P-2603 will need to be pulled <br /> back and the SLF underneath repaired prior to geomembrane acceptance. The area requiring <br /> repair was documented. <br /> Page 4 <br />