My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-09-30_REVISION - M1980244 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-09-30_REVISION - M1980244 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 4:56:59 AM
Creation date
10/8/2019 1:02:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
9/30/2019
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR118
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek&Victor Gold Mining Company ■ <br /> Squaw Gulch VLF Phase 2A Part 2 ■ <br /> Record of Construction Report <br /> 475.0106.032 <br /> September 30,2019 <br /> Figure 1 Site Location <br /> Figure 2 Certification and Geomembrane Installation Limits <br /> Figure 3 Destructive Sample Test Codes for Dual Hot Wedge Fusion Welds <br /> Figure 4 Destructive Sample Test Codes for Extrusion Welds with Leister Heat <br /> Seams <br /> LIST OF APPENDICES <br /> Appendix A Staff Schedule for CQA Monitor Personnel <br /> Appendix B Surveyor's Professional License <br /> Appendix B.1 Edward James Surveyor's Professional License <br /> Appendix B.2 Foresight West Surveyor's Professional License <br /> Appendix C Technical Specifications <br /> Appendix D Structural Fill Method Specifications <br /> Appendix E Soil Liner Fill Acceptance Forms <br /> Appendix F Weekly Reports <br /> Appendix G Photographic Documentation <br /> Appendix G.1 Photograph Log <br /> Appendix G.2 Construction Photographs <br /> Appendix H Laboratory Test Results <br /> Appendix H.1 Structural Fill Laboratory Test Results <br /> Appendix H.2 Leak Detection Fill Laboratory Test Results <br /> Appendix H.3 Soil Liner Fill Laboratory Test Results <br /> Appendix H.4 Drain Cover Fill Laboratory Test Results <br /> Appendix I Geosynthetics Quality Control Documents and Inventory <br /> Appendix 1.1 Geomembrane Inventory Control <br /> Appendix 1.1.1 40mil LLDPE Geomembrane Inventory Control <br /> Appendix 1.1.2 80mil LLDPE Geomembrane Inventory Control <br /> Appendix 1.2 Resumes of Installation Personnel <br /> Appendix 1.3 Geomembrane Roll QC Certificates <br /> Appendix 1.3.1 40mil LLDPE Geomembrane Roll QC Certificates <br /> P:\Projects\Cert Report-Phase 2A Part 2\475.0106.032 CCV PHASE 2A Part 2 ROC REPORT docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.