Laserfiche WebLink
Cripple Creek&Victor Gold Mining Company ■ <br /> Squaw Gulch VLF Phase 2A Part 2 ■ <br /> Record of Construction Report <br /> 475.0106.032 <br /> September 30,2019 <br /> RECORD OF CONSTRUCTION DRAWINGS <br /> RECORD DRAWING NO. 1 OF 11 TOP OF SOIL LINER FILL AS-BUILT 1 OF 4 <br /> ➢ RECORD DRAWING NO. 2 OF 11 TOP OF SOIL LINER FILL AS-BUILT 2 OF 4 <br /> ➢ RECORD DRAWING NO. 3 OF 11 TOP OF SOIL LINER FILL AS-BUILT 3 OF 4 <br /> ➢ RECORD DRAWING NO. 4 OF 11 TOP OF SOIL LINER FILL AS-BUILT 4 OF 4 <br /> ➢ RECORD DRAWING NO. 5 OF 11 LEAK DETECTION TRENCH AS-BUILT <br /> ➢ RECORD DRAWING NO. 6 OF 11 HIGH VOLUME SOLUTION COLLECTION PIPE <br /> AS-BUILT 1 OF 4 <br /> ➢ RECORD DRAWING NO. 7 OF 11 HIGH VOLUME SOLUTION COLLECTION PIPE <br /> AS-BUILT 2 OF 4 <br /> RECORD DRAWING NO. 8 OF 11 HIGH VOLUME SOLUTION COLLECTION PIPE <br /> AS-BUILT 3 OF 4 <br /> ➢ RECORD DRAWING NO. 9 OF 11 HIGH VOLUME SOLUTION COLLECTION PIPE <br /> AS-BUILT 4 OF 4 <br /> ➢ RECORD DRAWING NO. 10 OF 11 GEOMEMBRANE PANEL LAYOUT AS-BUILT <br /> ➢ RECORD DRAWING NO. 11 OF 11 DRAIN COVER FILL AS-BUILT ISOPACH <br /> LIST OF TABLES <br /> Table 1 Summary of Earthworks Material Specifications <br /> Table 2 Earthworks Testing Summary and Frequency <br /> Table 3 Summary of Weather Data <br /> Table 4 Fill Temperature Monitoring Summary <br /> Table 5 CQA Earthworks Laboratory Testing Summary—Structural Fill <br /> Table 6 CQA Earthworks Laboratory Testing Summary— Leak Detection Fill <br /> Table 7 CQA Earthworks Laboratory Testing Summary—Soil Liner Fill <br /> Table 8 CQA Earthworks Laboratory Testing Summary— Drain Cover Fill <br /> Table 9 Nuclear Gauge Moisture-Density Testing Summary—Soil Liner Fill <br /> Table 10 Soil Liner Fill Depth Verification Summary <br /> LIST OF FIGURES <br /> P:\Projects\Cert Report-Phase 2A Part 2\475 0106 032 CCV PHASE 2A Part 2 ROC REPORT.docx <br />