Laserfiche WebLink
• <br />• <br />0 <br />TASK 1 Building Demolition <br />STRUCTURE or ITEM <br />DESCRIPTION <br />DIMENSIONS <br />DEMOLITION <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />UNIT <br />COST <br />TOTAL <br />COST <br />Office Trailer <br />24x6O'xlO* <br />Replace tires, remove <br />interiorjoints, haul 2-12' <br />wide trailers to Durango. <br />2 units <br />EA <br />750+ <br />$2.00/ <br />mile RT <br />$1,600 <br />Portal Building <br />12'x20'x8' <br />Demolish dump on-site <br />1,920 <br />CF <br />$0.55 <br />$1,125 <br />Main Conveyor <br />40 LF <br />Conveyor, elevated - <br />5'Wx 6'H <br />40 <br />LF <br />$30 <br />$1,200 <br />Scale House <br />0'x42'x10' <br />Doze & bury at highwall <br />16,800 <br />CF <br />$0.55 <br />$9,240 <br />Tipple Building (Pole Barn <br />Construction -12 Steel Poles) <br />60'x65'x1' <br />Roof Vol. —bury <br />. Demolish w/dozer- <br />athi h� wall <br />3,900 <br />CF <br />$0.55 <br />$2,145 <br />Tipple Lean-to Shed <br />18'x45'x8' <br />Roof Vol. <br />Demolish w/dozer- <br />bury on-site <br />6,480 <br />CF <br />$0.55 <br />$3,564 <br />East Bins <br />15x25x50' <br />4 section Bins <br />Disassemble bin, cut- <br />torch 12 uprights- bury <br />at hi hwall <br />64 man hrs <br />H <br />0 <br />$1,600 <br />Crusher - <br />15'x1 TAO' <br />Demolish = bury at <br />highwall <br />10,200 <br />CF <br />$0.55 <br />-$5j610- <br />Mine Fan <br />x6'x3O',4x6'x10 <br />Demolish -bury at <br />highwall <br />960 <br />CF <br />$0.55 <br />$528 <br />Bath House <br />0'x6O'x18' <br />Doze &beat hic hwall <br />42,200 <br />CF <br />$0.1163 <br />$5,023 <br />Stacker Conveyor <br />300 LF <br />Conveyor- elevated- <br />5'Wx 6'H <br />.300 <br />LF <br />$30 <br />$9,000 <br />Stacker Tower #1 <br />1 O'x2O'x5O' <br />Demolish - bury at <br />highwall <br />10,000 <br />CF <br />$0.55 <br />$5,500 <br />Stacker Tower #2 <br />8'xl2'x25' <br />Demolish - bury at <br />highwall <br />2,400 <br />CF <br />$0.55 <br />$1320 <br />Remove Two 500 Gallon Gas <br />Tanks <br />2@500 Gallons <br />Excavate & load <br />2 <br />EA <br />$335 <br />$670 <br />Burn Trash and Debris, Bury <br />On -Site <br />Assume 150 CY <br />Doze & bury at highwall <br />'150 <br />CY <br />$1.00 <br />$150 <br />TOTAL <br />$48,275 <br />