My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-09-18_PERMIT FILE - C1981035 (10)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035
>
2019-09-18_PERMIT FILE - C1981035 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2019 9:09:43 AM
Creation date
10/8/2019 9:01:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
PERMIT FILE
Doc Date
9/18/2019
Doc Name
Reclamation Bond Information/Estimates
Section_Exhibit Name
KI Appendix 12
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />�1 <br />COST SUMMARY <br />ask # <br />Description <br />Hours <br />Direct Costs <br />1 <br />Structure demolition <br />116.4 <br />$48,27 <br /># 3 UPPER FACILITIES AREA - PREVIOUSLY DISTURBED <br />Rip Upper Facilities Area <br />15.8 <br />$1,99 <br />Push 12" coaly -waste to highwalls <br />11.6 <br />$1,40 <br />Haul topsoil/growth medium to Upper Facilities Area <br />9.6 <br />$1,433 <br />Finish grade <br />2.2 <br />$16 <br />6* <br />Apportioned revegetation costs 1.96 acres <br /># 4 HIGHWALL AREA - PREVIOUSLY DISTURBED <br />7 <br />Haul topsoil/growth medium to highwall <br />4.7 <br />$69 <br />8 <br />Doze fill into portals, rough -grade fill slope and topsoil <br />1.9 <br />$23 <br />Apportioned revegetation costs 1.31 acres <br />73 <br /># 2 LOWER FACILITIES AREA - PREVIOUSLY DISTURBED <br />10A & B <br />Rip & final grade w/12H grader <br />2.5 <br />$18 <br />11* <br />Apportioned revegetation costs 1.19 acres <br /># 5 RECLAIMED REFUSE AREA - PREVIOUSLY DISTURBED <br />12 <br />Doze 3.5' fill (Completed) <br />4.3 <br />$49 <br />13 <br />Doze growth medium @ 6" (Completed) <br />.6 <br />$70 <br />14* <br />Apportioned revegetation costs 0.58 acres (Completed) <br />$28 <br />FRIAREA=CURRENT STANDARDS <br />15 <br />Haul 3.5' fill to refuse pile <br />33.6 <br />$4,99 <br />16 <br />Rough grade fill <br />1 <br />$7 <br />17 <br />Haul topsoil to refuse pile <br />8.4 <br />$1,25 <br />18 <br />Finish grade topsoil <br />1.2 <br />$90 <br />19* <br />Apportioned revegetation costs 1.08 acres <br />TOPSOIL BORROW AREA <br />20 <br />Finish grade = 2 acres disturbance <br />2.4 <br />$16 <br />21* <br />Apportioned revegetation costs 2.0 acres <br />:± <br />SEAL VENTS <br />22 <br />Seal vent hole (Completed) <br />4 <br />$1,44 <br />#1 EAST & WEST POND AREA- PREVIOUSLY DISTURBED <br />23 <br />Reclaim East and West ponds <br />23.2 <br />$2,80 <br />24 <br />Construct final drainage channel, riprap & filter fabric <br />17.0 <br />$3,91 <br />25* <br />Apportioned revegetation costs 1.86 acres <br />' `- <br />TOTAL REVEGETATION COSTS <br />26*** <br />Includes all areas @ 10.7 acres <br />16 <br />$4,970 <br />MOB/DEMOB <br />27 <br />Initial Mob/Demob costs <br />6.2 <br />$2,97 <br />28 <br />Pond removal, ditch construction, revegetation Mob/Demob <br />4.2 <br />$65 <br />29 <br />Site maintenance/equipment & labor costs. 5 trips in 10 years <br />40 <br />$5,63 <br />Total hours & direct costs <br />326.8 <br />$83,92 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT <br />Liability insurance: <br />1.55% <br />$1,301 <br />Performance bond: <br />1.05% <br />$881 <br />Job superintendent :14 hrsx$36.25/hr <br />163.4 <br />$5,923 <br />Profit: <br />10% <br />$8,392 <br />Total Overhead & Profit: <br />$16,49 <br />CONTRACT AMOUNT (Direct + O&P) <br />$106,65 <br />ENGINEERING & PROJECT MANAGEMENT <br />Engineering and bid preparation <br />4.25% <br />$3,567 <br />Reclamation management <br />5.00% <br />$4,196 <br />Total indirect costs <br />$7'76 <br />TOTAL BOND AMOUNT (Direct + Indirect) <br />$108118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.