My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-07_REVISION - C1981018 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2019-10-07_REVISION - C1981018 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:11:00 PM
Creation date
10/7/2019 1:13:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
10/7/2019
Doc Name
Reclamation Cost Estimate
From
Zach Trujillo
To
Clayton Wein
Type & Sequence
TR72
Email Name
CCW
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cycle Time: <br /> Scraper Loading Time: 1.00 Minutes <br /> Maneuver and Spread Time: 0.60 Minutes <br /> Job Condition Correction: Site Altitude: 5300 feet <br /> Scraper Push Dozer Source <br /> Altitude Adj: 1.000 NA (CAT HB) <br /> Job Efficiency: 0.830 NA (CAT HB) <br /> Net Correction: 0.830 NA <br /> Travel Time: <br /> Road Condition: Firm, smooth,rolling,dirt/It. surfaced,watered,maintained 3.0 <br /> Haul Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity Travel Time <br /> (%) (%) (%) (f m) (min) <br /> 1 1800.00 1.00 3.00 4.00 2394 0.99 <br /> 2 500.00 10.00 3.00 13.00 710 0.44 <br /> Haul Time: 1.43 minutes <br /> Return Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity Travel Time <br /> (f m) (min) <br /> 1 500.00 -10.00 3.00 -7.00 2972 0.23 <br /> 2 1800.00 -1.00 3.00 2.00 2960 0.61 <br /> Return Time: 0.84 minutes <br /> Total Scraper team cycle time: 3.87 minutes <br /> Adjusted for job conditions: 746.36 LCY/Hour <br /> Selected Number of Scrapers: 2 Scraper(s) <br /> Adjusted single scraper team(unit)hourly production: 746.36 LCY/Hour <br /> Adjusted multiple scraper team(fleet)hourly production: 29239.07 LCY/Hour <br /> Unadjusted unit production/hour: 899.22 LCY/Hour <br /> Optimal Number of Scrapers per push <br /> dozer: <br /> JOB TIME AND COST <br /> Fleet size: 3 Team(s) Total job time: 76.61 Hours <br /> Unit cost: $1.059 /LCY Total job cost: $1819684 <br />
The URL can be used to link to this page
Your browser does not support the video tag.