My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-07_REVISION - C1981018 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2019-10-07_REVISION - C1981018 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:11:00 PM
Creation date
10/7/2019 1:13:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
10/7/2019
Doc Name
Reclamation Cost Estimate
From
Zach Trujillo
To
Clayton Wein
Type & Sequence
TR72
Email Name
CCW
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCRAPER TEAM WORK <br /> Task description: Cover and Regrade RPA with Topsoil <br /> Site: Deserado Mine Permit Action: TR72 Permit/Job#: C 1981018 <br /> PROJECT IDENTIFICATION <br /> Task#: 002 State: Colorado Abbreviation: None <br /> Date: 10/7/2019 County: Rio Blanco Filename: CO18-002 <br /> User: ZTT <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: 1 per daX <br /> Equipment Description <br /> -Scraper: Cat 637G w/push-pull <br /> -Dozer: NA <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: NA <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA NA NA NA NA <br /> Ownership cost/hour: $174.06 NA NA NA NA NA <br /> Operating cost/hour: $190.35 NA NA NA NA NA <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own.cost/hour: NA NA NA NA NA NA <br /> Ripper op. cost/hour: NA NA NA NA NA NA <br /> Operator cost/hour: $30.86 NA NA NA NA NA <br /> Unit Subtotals: $395.26 NA NA NA NA NA <br /> Number of Units: 6 0 0 0 0 0 <br /> Group Subtotals: Work: $2,371.56 Support: $0.00 Maint: $0.00 <br /> Total work team cost/hour: $2,371.56 <br /> MATERIAL QUANTITIES <br /> Initial volume: 1549396 CCY Swell factor: 1.111 <br /> Loose volume: 1719534 LCY <br /> Source of estimated volume: C-1981-018 Permit Volume V(12"depth) <br /> Source of estimated swell factor: Operator Study <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,743 lbs/LCY Struck Volume: 24.00 LCY <br /> Material description: User Provided Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 29.75 LCY Adjusted Capacity: 29.00 LCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.