My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-07_REVISION - C1981018 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2019-10-07_REVISION - C1981018 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:11:00 PM
Creation date
10/7/2019 1:13:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
10/7/2019
Doc Name
Reclamation Cost Estimate
From
Zach Trujillo
To
Clayton Wein
Type & Sequence
TR72
Email Name
CCW
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: Reclaim RPA and Associated Facilities <br /> Site: Deserado Mine Permit Action: TR72 Permit/Job#: C 1981018 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 10/7/2019 County: Moffat Filename: CO18-000 <br /> User: ZTT <br /> Agency or organization name: DRMS <br /> TASK LIST (DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Compact Refuse at RPA COMPACT 1 56.39 $084 <br /> 002 Cover and Regrade RPA with Topsoil SCRAPERI 3 76.61 $18104 <br /> 003 Cover and Regrade RPA with Subsoil SCRAPERI 3 111.35 $264,076 <br /> 004 Drill Seeding- RPA REVEGE 1 47.00 $421412 <br /> 005 Regrade RPA Topsoil Pile Footprints DOZER 1 9.01 $21625 <br /> 006 Regrade RPA Subsoil Pile Footprint DOZER 1 10.96 $3,196 <br /> 007 Drill Seeding- RPA Topsoil/Subsoil Pile REVEGE 1 6.50 $508 <br /> Footprints <br /> 008 Regrade Pond RPA Area DOZER 4 1.28 $11445 <br /> 009 Regrade RPA Pond Topsoil DOZER 1 3.54 $1,031 <br /> 010 Drill Seeding- RPA Pond REVEGE 1 1.00 $886 <br /> 011 Clean Sediment Pond RPA one time TRUCK 1 1 11.85 $5,166 <br /> SUBTOTALS: 335.49 $516,213 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $10,428 <br /> Performance bond: 1.05 Total= $51420 <br /> Job superintendent: 167.74 Total= $11,639 <br /> Profit: 10.00 Total= $51,621 <br /> TOTAL O&P= $791109 <br /> CONTRACT AMOUNT(direct+O&P)= $595,322 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $0 Total= $0 <br /> Engineering work and/or contract/bid preparation: 4.61 Total= $27,444 <br /> Reclamation management and/or administration: 3.58 $211313 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $127,865 <br /> TOTAL BOND AMOUNT(direct+indirect)= $644,078 <br />
The URL can be used to link to this page
Your browser does not support the video tag.