My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-07_REVISION - C1981018 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2019-10-07_REVISION - C1981018 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:11:00 PM
Creation date
10/7/2019 1:13:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
10/7/2019
Doc Name
Reclamation Cost Estimate
From
Zach Trujillo
To
Clayton Wein
Type & Sequence
TR72
Email Name
CCW
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division of Reclamation, Mining and Safety <br /> To: Clayton Wein <br /> From: Zach Trujillo <br /> CC: Jason Musick <br /> Date: October 7, 2019 <br /> Re: Deserado Mine TR-72 RCE <br /> As requested, I have performed a Reclamation Cost Estimate (RCE) update for the <br /> Deserado Mine (Deserado) Technical Revision No. 72 (TR-72). The total value of this <br /> estimate is $644,078.00 (see attached cost estimate). The primary costs with this revision <br /> come from the haul and regrade scraper tasks for topsoil and subsoil. Volumes for these <br /> tasks were calculated using the footprint of the RP-A final configuration and required <br /> topsoil(12 inches) and subsoil (18 inches) depths for refuse piles as required by Deserado's <br /> PAP found on Section V.,page V-26. Additionally, to ensure enough subsoil and topsoil are <br /> available for the reclamation of RP-A, a volume comparison was done between required <br /> volumes and provided volumes shown on Map 162. All volumes necessary as required by <br /> Deserado's PAP has been met for TR-72. <br /> The Division holds a performance bond in the amount of$5,840,257.00 for the Deserado <br /> Mine. Deserado Mine's current Required Liability is $5,815,257.00. With the amount <br /> calculated for the Deserado Mine TR-72 of$644,078.00,the Division will require <br /> $619,078.00 of additional bond monies to ensure completion of reclamation at the <br /> Deserado Mine in the event the work had to be performed by the Division. <br /> This concludes my review of Deserado Mine's TR-72 RCE. If you have any questions, <br /> feel free to contact me. <br /> Sincerely, <br /> Zach Trujillo <br /> Environmental Protection Specialist <br /> (303) 866-3567 ext. 8164 <br /> Zach.Trujillogstate.co.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.