Laserfiche WebLink
M-2012-050 <br /> September 9, 2019 <br /> Page 8 <br /> (v) Topsoiling- specify anticipated minimum depth or range of depths for those areas where <br /> topsoil will be replaced. <br /> Range of topsoil depth to be applied within each phase. Response: updated <br /> What is the updated worst case scenario,phase 3 and 4?Volumes to be applied? Response: updated, <br /> worst case scenario will not increase <br /> 6.4.6 EXHIBIT F - Reclamation Plan Map <br /> The map(s) of the proposed affected land,by all phases of the total scope of the mining operation, <br /> shall indicate the following: <br /> Placement of cottonwood trees not depicted/specified. <br /> Response: updated <br /> Page 5 of 10 <br />