Laserfiche WebLink
M-2012-050 <br /> September 9, 2019 <br /> Page 3 <br /> C-2 Both the pre-mining and post-mining topography is depicted for proposed area. Post-mining <br /> topography should be depicted on reclamation maps only.Additionally consider removing <br /> topography from C-1 to make it easier to read. Response: Post mining topo removed. Two separate <br /> maps for clarity also created. <br /> No current topography for existing pit provided, only pre-mining topography in 2012. Response: <br /> More recent topography of existing mining operations added <br /> (d) the total area to be involved in the operation, including the area to be mined and the area <br /> of affected lands (see definition of"Affected Land"); <br /> The total land to be affected within the 5.8 acre expansion is unclear, include an affected lands <br /> boundary in addition to AM-1 boundary for maps C-1 and C-2. Response:Affected lands of existing <br /> area and AM-1 clarified for permit boundary and total affected area, area of mining limits,affected <br /> land,and permitted acreage all shown.. <br /> Page 2 of 10 <br />