Laserfiche WebLink
1 J&T Consulting, Inc. J-2 Contracting Company <br /> DPG Pit <br /> 9/272019 <br /> PRmlamation Bond Quantities and Costs <br /> 019 7AT C41111111111110111am IIne. 18114 DPG Pit Rae! Calm <br /> summary of Unit Costs <br /> Direct costs <br /> Re-applying topsoil 12"thick $1,800.00 /acre <br /> Revegetating disturbed area $1,000.00 /acre <br /> Devvatering full pit $400.00 / million gallons <br /> Phase 1 Slurry Wall Cost $360.00 / linear foot <br /> (0301t Q$M-51-70 R Q W-71-95 it Q$13M <br /> Phase 2 Slurry Wall Cost $425.00 / linear foot <br /> (0-W ft Q$341-51-70 rt Q$44!-71-95 R $13M <br /> Phase 3 Slurry Wall Cost $360.00 / linear foot <br /> (0-50 R Q$31 t-51-70 ft Q$4nt-71-95 R $13M) <br /> Phase 4 Slurry Wall Cost $542.00 / linear foot <br /> (OJOftQ$34!-51-70RQW-71-95RQ$134V <br /> Phase 5 Slurry Wall Cost $190.00 / linear foot <br /> (0-50 R Q$311t-51-70 ft Q$4/R-71-95 IT $13MM <br /> Scarifying Ground $200 /acre <br /> Mobilization $2,500 lump sum <br /> Overhead and Profit Costs <br /> Liability insurance 1.55% of direct cost <br /> Performance bond 1.05% of direct cost <br /> Profd 10.00% of direct cost <br /> Total Overhead Cost 12.60°% of direct cost <br /> Project Management <br /> Engineering and bidding 4.25% of direct cost <br /> Management and administration 5.00% of direct cost <br /> Total Additional Cost 9.25% of direct cost <br />