September 25, 2019 C-1980-007/West Elk Mine LDS <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> N -Air Resource Protection N -Roads <br /> N -Availability of Records N -Reclamation Success <br /> N -B ackfill& Grading N -Revegetation <br /> N -Excess Spoil and Dev. Waste N - Subsidence <br /> N -Explosives N - Slides and Other Damage <br /> N -Fish&Wildlife R - Support Facilities On-site <br /> R -Hydrologic Balance N - Signs and Markers <br /> R - Gen. Compliance With Mine Plan N - Support Facilities Not On-site <br /> N - Other N - Special Categories Of Mining <br /> R -Processing Waste R - Topsoil <br /> COMMENTS <br /> This was a partial inspection by Leigh Simmons of the Division of Reclamation, Mining and Safety <br /> (Division). Bob Munz of Mountain Coal Company(MCC) accompanied the inspection. The weather was clear and <br /> dry. The mine was active. <br /> HYDROLOGIC BALANCE -Rule 4.05 <br /> Drainage Control 4.05.1,4.05.2,4.05.3; Siltation Structures 4.05.5,4.05.6; Discharge Structures 4.05.7, 4.05.10; <br /> Diversions 4.05.4;Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br /> Drainage—Acid and Toxic Materials 4.05.8; Impoundments 4.05.6,4.05.9; Stream Buffer Zones 4.05.18: <br /> Work was in progress to clean out the eastern cell of the RPE pond. The material removed from the pond <br /> was being spread on the surface of the RPEE to dry. <br /> GENERAL MINE PLAN COMPLIANCE: <br /> The longwall was in the E8 panel,between cross-cuts 11 and 12 on the E8 headgate. <br /> The SS 1 headgate had been completed. Development miners were in the SS 1 start line, and the SS 1 tail <br /> gate(between cross cuts 15 and 16). <br /> No progress past cross cut 22 had been made on the Sunset Mains South. <br /> PROCESSING WASTE/COAL MINE WASTE PILES—Rule 4.10 and 4.11 <br /> Drainage Control; Surface Stabilization; Placement: <br /> On the RPE, work had continued to reduce the size of the temporary waste pile. A section of the outslope <br /> of the RPE had recently been reclaimed using topsoil stripped from above the RPEE. Seed had been spread and <br /> mulched with straw. Straw wattles had been staked across the slope. <br /> Work was continuing on the RPEE to extend the underdrain. Topsoil had been stripped and temporarily <br /> stockpiled. A small excavator was being used to break up large boulders for use in the underdrain. A dozer was <br /> being used to spread pond cleanings and refuse on the surface of the pile. <br /> Number of Partial Inspection this Fiscal Year: 2 <br /> Number of Complete Inspections this Fiscal Year: 1 <br /> Page 2 of 17 <br />