Laserfiche WebLink
PERMIT#:M-1988-108 <br /> INSPECTOR'S INITIALS: ECS <br /> INSPECTION DATE: September 19,2019 <br /> PHOTOGRAPHS <br /> i <br /> a <br /> ` This site is the location of a proposed amendment to the <br /> approved construction materials operation.Arcosa IWB,I1C, <br /> h wose address is 11723 Highway 93,Boulder,Colorado 80303 -o . <br /> 9-101,has <br /> applied for an <br /> TR N L W B L L C and <br /> Ainendment to Redamatlon9PermitNO.M-88-108 with the <br /> HAS BEEN ISSUED - ColoratloMinedLandReclamationBoard,Anyonewishingto <br /> RECLAMATION P A comment on the application may view the application at the <br /> THE C PERMIT By' - Jefferson County perk and Recorder's Office,too Jeffers on a <br /> .� MLRB County Pkwy,Golden,Colorado 80401,and should send <br /> PERM <br /> jT NUMBER comments prmrto the eadOf the puhliocomment period to <br /> M'$e�—jDg the Division of Redamatiun,Mining,and Safety,1313 Sherman <br /> st,Room tlS,Denver,Colorado <br /> Photo 1—Site identification sign at site entrance will need to Photo 2—Notice of amendment applied for sign at site <br /> be corrected to show current permittee(Arcosa LWB,LLC). entrance as required. <br /> On <br /> - <br /> 7. , FT <br /> -- -•.k� . <br /> is'i J ,li l � �� ��04�:•' , � <br /> Photo 3—North,inactive,end of pit water retention cells. Photo 4—Active shale mining in center and south portions of <br /> Pump in north cell provides water to the plant. pit.Operator intends to dewater pit floor over the winter. <br /> _F <br /> Photo 5—South end of pit with new stripped and benched Photo 6—Representative photo of scrap/refuse located north <br /> area.Darker areas on pit wall show groundwater seepage of the plant area that will need to be properly disposed of. <br /> into pit from alluvium/shale contact. <br /> Page 3 of 3 <br />