Laserfiche WebLink
4 �0o TR08 - <br /> COLORADO DIVISIC iTION, MINING AND SAFETY <br /> * * 1313 Sherman Street,R TC1lmac do 80203 ph(303)866-3567 <br /> `e'6 RECEIVED <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET SEP 19 2019 <br /> File No.: M- 1973-007-SG Site Name:Daniels Sand Pit 2 DIVISION OF RECLAMATION <br /> DINING AND SAFETY <br /> County El Paso TR# (DRMS Use only) <br /> Permittee:Aggregate Industries-WCR, Inc. o <br /> 5. tD <br /> Operator(If Other than Permittee): Aggregate Industries-WCR, Inc. dba Transit Mix Concrete Co. ° -0 W <br /> Permittee Representative: Joel Bolduc , O <br /> � O <br /> Please provide a brief description of the proposed revision: Grant utility easement to Security Water District ° Cl) <br /> Cn <br /> for construction of water pipeline within the boundaries of M-1973-007-SG. Please see attached cover letter, map <br /> and Exhibit C to Grant of Utility Easement. <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or 0 o <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted — <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, ° Oo <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type -Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> I IOc, 111, 112 construction materials, and 112 quarries $216 x <br /> 112 hard rock(not DMO) $175 ❑ RECEIVED <br /> 110d, 112d(1, 2 or 3) $1006 ❑ <br /> SEP '1 9 201:J <br /> DIVISION OF RECLAMATION <br /> Ml4;NG A.ND SAFETY <br />