Laserfiche WebLink
The below table has been updated from the table submitted in CC&V's <br /> preliminary adequacy review response to include the height of each facility <br /> structure. <br /> Conceptual Cresson Yard and Portal Buildin s <br /> Structure # Description Width (ft) Length ft Area ftz Height ft <br /> Fixed Maintenance Shop <br /> 1 Septic Tanks 53 91 4,823 12 <br /> Communications Building <br /> Mobile Maintenance Shop <br /> 2 Lube Bay &Wash Bay 204 90 18,360 18 <br /> Sho , Lube, Wash Bay Aron <br /> 3 Fuel Island 57 37 2,109 6 <br /> Water Tank* <br /> 4 Compressor Housing* 143 52 7,436 6 <br /> Sump* <br /> 5 CRF/Shotcrete Plant* 55 120 6,600 18 <br /> 6 Portal Extension* - sprayed 18 50 900 20 <br /> concrete directly on pit surface <br /> *Not a building. <br /> 4) Fuel Island Facility: The response was adequate. The DBMS accepts CC&V's <br /> commitment to "submit additional information similar to that submitted with TR-63 <br /> as an addendum to this TR once the fuel island design is complete." <br /> No response required. <br /> 5) Implementation Schedule: The response was adequate. <br /> No response required. <br /> Should you require further information, please do not hesitate to contact Katie Blake via <br /> phone or email at 719.689.4048 and Katie.Blake(d-)newmont.com or myself at <br /> 719.689.4042 and Justin.Raglin(cD-newmont.com. <br /> Sincerely, <br /> Justin Raglin <br /> Senior Environmental Manager <br /> Cripple Creek & Victor Mine <br /> JR/kb <br />