Laserfiche WebLink
- A portable asphalt plant with associated tanks <br /> - A portable concrete plant with associated tanks <br /> - Truck scales <br /> - A portable office trailer <br /> - Equipment parking and maintenance <br /> - Overflow resource stockpiling <br /> - A portable crusher with associated tanks <br /> - Active pit serving as a stormwater settling pond <br /> - 250 gallon diesel fuel tank in secondary containment(110%of tank capacity) <br /> 1,000 gallon water tank used for dust suppression <br /> Portable lights with a generator for emergency after hours maintenance support <br /> The following list is the best estimate of equipment that will be used onsite throughout the mine <br /> life: <br /> - 2-4 Front end loaders <br /> - crushing and screening plant <br /> - 1-3 D-10 Bulldozer <br /> - 14000 gallon water truck <br /> - off-highway road haul trucks (number will depend upon production needs) <br /> - 15 and 24 ton on-road haul trucks (number will depend upon production needs) <br /> A portable asphalt plant may be erected on the site periodically. Material crushed and stockpiled <br /> on site may be used for asphalt production. Maximum asphalt production will not exceed 2,000 <br /> tons per day. Asphalt production may occur only during the warm season months of April <br /> through October. Components associated with the portable asphalt plant include: <br /> - Liquid asphalt storage <br /> - Aggregate feed bins <br /> - Mixer <br /> - Conveyors <br /> - Lime silo <br /> Bradford Mesa Quarry <br /> August 2019 D-9 µ <br />