Laserfiche WebLink
Tom Bird,GCC Energy, LLC <br /> Page 2 of 2 <br /> 17 July 2019 <br /> Maps <br /> 14. No additional response required. <br /> 15. No additional response required. <br /> 16. No additional response required. <br /> 17. No additional response required. <br /> 18. No additional response required. <br /> 19. No additional response required. <br /> New Adequacy Item Based on the Reclamation Cost Estimate <br /> 20. Additional detail should be provided for volumes of Plant Growth Medium and the cover <br /> material for the refuse pile. Ideally,volumes will be provided for all sources of material, <br /> including stockpiles and borrow areas. Short of this ideal,please provide as much <br /> information as possible. This information should be included in Section 2.05.4 of the PAP, <br /> preferably in tabular format. A related issue is the area located south of the East Pond <br /> that has been designated as a Plant Growth Medium Storage Area. Please add a <br /> discussion of the planned use of this area in the text (including volumes as <br /> applicable). <br /> If you have any questions feel free to contact me at rob.zubergstate.co.us or(303) 866-3567, extension <br /> 8113. <br /> Sincerely, <br /> Robert Zuber, P.E. <br /> Environmental Protection Specialist II <br />