My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-09-17_REVISION - C1981035 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2019-09-17_REVISION - C1981035 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 9:27:47 AM
Creation date
9/17/2019 12:32:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
9/17/2019
Doc Name
Adequacy Review #3
From
DRMS
To
GCC Energy, LLC
Type & Sequence
TR27
Email Name
RDZ
JDM
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L D o <br /> Division of Reclamation, <br /> A&ID-,da <br /> Mining and Safety <br /> Department of Natural Resources <br /> September 17,2019 <br /> Mr. Tom Bird <br /> GCC Energy, LLC <br /> 6473 County Road 120 <br /> Hesperus, CO 81326 <br /> Re: King Coal Mine, Third adequacy letter for TR-27 <br /> Dear Mr. Bird: <br /> The Division of Reclamation,Mining and Safety(the Division) received GCC's response to our TR-27 <br /> second adequacy review. Thank you for your response letter dated September 10, 2019. Your responses <br /> addressed most of our issues,but we ask that GCC staff respond to an additional item(Item#20 below) <br /> and the following follow-up adequacy items. <br /> Section 2.05 <br /> 1. No additional response required. <br /> 2. No additional response required. <br /> 3. No additional response required. <br /> Appendix 10 <br /> 4. No additional response required. <br /> 5. No additional response required. <br /> 6. The Division has a follow-up comment. There appears to be an error in the cover page for <br /> the newly provided Trautner report dated June 2015. The appendix has been labeled <br /> Appendix 10(4B),but the provided cover page is Appendix 10(4A). Please address this <br /> discrepancy. <br /> Appendix 11 <br /> 7. No additional response required. <br /> 8. No additional response required. <br /> 9. No additional response required. <br /> 10. No additional response required. <br /> 11. No additional response required. <br /> 12. All of the Division's comments were addressed,but one item requires additional information. In <br /> item 12.e.,the Division wrote, "In the"Revision 5" document, Item#4 should discuss the sizes <br /> and materials (CMP,RCP, or other) of the culverts." The intent of this comment was for GCCE <br /> to include the diameters of the culvert pipes. Please provide the pipe diameters in the report. <br /> 13. No additional response required. <br /> 0 <br /> 1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br /> Jared S. Polis, Governor Dan Gibbs, Executive Director Virginia Brannon, Director '�1876� <br />
The URL can be used to link to this page
Your browser does not support the video tag.