Laserfiche WebLink
Cost Summary Work sheet ont'd Task#000 Page 4 of 13 <br /> Truck Maneuver and Dump 0.90 Minutes Adjusted for site altitude: �..0 0.900 Minutes <br /> Time: <br /> Truck Travel(Haul&Return)Time: Road Condition: Rutted dirt,little mainten nc ,no water. "'tire <br /> -- <br /> enetrati n_ . <br /> Haul Route: <br /> Seg## Maul Distance Grade % Roll. Res Total Res velocity Travel <br /> (Ft) M M 0m Time <br /> 1 3960.00 1.00 5.00 6.00 1855 2.181 <br /> L2 390.00 •7.00 1 5.00 - .0 931 1.390 <br /> Haul Time: 3.571 Minutes <br /> Return Route: <br /> eg## Haul Distance Grade Roll.Res Total Res Velocity Travel <br /> Ft M M rpm Time <br /> r�i n <br /> +'1 396 .00 7.00 5.00 1 . 1440 2.756 <br /> #r 396 .00 1. -1.00 5.00 4.00 2849 1.401 <br /> Return Time: 4.157 minutes <br /> Total Truck Cycle Time: 10.093 minutes <br /> Loading Tool unit <br /> Production 467.20 L /Hour Adjusted for job efficiency: 387.78 L Hour <br /> Truck Unit Production <br /> 67.81 L Hour Adjusted for job efficiency: 56.29 L our <br /> Optimal No.of Trucks: 7 Trucks Selected Number of Trucks: 2 Truck <br /> Adjusted hourly truck team production: 11 . 7 L CY/Hour <br /> Adjusted single truck/loader team production: 112.57 L /Hour <br /> Adjusted multiple trucklloakder team production: 112.57 L 7 our <br /> JOB TIME AND COST <br /> Fleet size: 1 Team Total,job time: 152,37 Hours <br /> Chit cost: $2.069 /LCY Total job cost: $35476 <br /> CIRCES Cost Estimating software <br />