Laserfiche WebLink
Cost Summary Worksheet ont'd Task#000 Page 3 of 1 <br /> Rated Payload: 35,400 Pounds <br /> Payload Capacity: 12.21 LCY <br /> Truck Bed rolurane Ba * <br /> Struck Volume: 10.00 LCY <br /> Heaped Volume: 12.00 LCY <br /> Average Volume: 11.00 LCY <br /> Adjusted Volume: 12.00 LCY <br /> Final Truck Volume Based on Number of Loader Passes: 11.41 LCY <br /> Loading Tool CapaciLy <br /> Bucket Size Class: NA <br /> Rated Capacity: 3.900 L (heaped) <br /> Bucket Fill Factor: 0.975 Loose material-miked moist aggregates(9 -100 )0.975 <br /> Adjusted Capacity: 3,803 LCY <br /> Job Condition Corrections: Site Altitude ft. :7400 feet <br /> Truck Loader Source <br /> Altitude Add: 1,000 1.000� �'99) <br /> � »»», <br /> Job Ffficienc <br /> 0.830 0.830 (CAT HB <br /> Net Correction: 0,830. O,830 <br /> Loading'Tool Cycle Time: Number of Loading Tool Passes Required to Fill passes <br /> Truck: <br /> Excavators and Front Shovels: <br /> Lachine Circle Time vs.Job Condition Rating: NA <br /> Selected Value within this Basic Rating: IAA <br /> Track Loaders-Material Description: <br /> Cycle Time Elements(min.): <br /> Load: NA Maneuver: NA Lump: 0.100 <br /> Wheel and Track Loaders-Unadjusted Basic Loader Cycle Time(load,dump, 0.483 minutes <br /> maneuver): <br /> C cle Time Factors Factor min. Source <br /> Material: Mixed material 0.02 0.020 (Cat B <br /> Stockpile: Conveyor or dozer piled 10 ft.high or less 0.010 (Cat B <br /> 0.01 <br /> Truck Ownership: Common ownership of trunks and loaders- -0.04 (Cat B <br /> .04 <br /> oration: Constant o-erasion- . 4 - . 4 (Cat HB <br /> Dump Target: 1 Nominal tar et 0.00 0.000 (Cat SIB) <br /> Net Cycle Time Adjustment: -0.0 0 minute <br /> Adjusted Loader Cycle Time: 0,433 minutes <br /> Net Load Time per Truck: 0.965 minutes <br /> 'Crack Cycle Time: <br /> Truck Exchange Time: 0.50 Minutes Adjusted for site altitude: 0.500 Minutes <br /> Truck Load Time: 0.965 Minutes Adjusted for site altitude: 0.965 Minutes <br /> CIRCES Cost Estimating Software <br />