Laserfiche WebLink
Haul routes for growth medium were taken a ntr ld to eentr id from Plant Growth <br /> Medium Storage Area Map King 1-0 in the upper east drainage to RPE. <br /> • Haul routes for cover material were talon eentr id to eentroid from Huntington <br /> Pond Area to RPE using existing roads and down through the eastern drainage <br /> (approx. 1.5 miles).Two haul route segments were used to differentiate critical <br /> grade changes along the route. <br /> As discussed, one of the concerns was ensuring that GCC not only has enough cover <br /> material and growth medium for the reclamation of the refuse pile expansion area but <br /> also the current active refuse pile. Based on the volumes provided for both cover material <br /> and growth medium by GC , there is en u h material to ensure required depth is met for <br /> both the active refuse pile and the proposed expansion. Please see the following table for <br /> more details. <br /> Required Reclamation Volumes for ling I Refuse Pile <br /> Location Area Cover Material' Growth Medium' Dotes <br /> (Acre) (cu. d.) (cu.yd.) <br /> Active 1.85 10,,476 1,p522 Area based on Section 2.05.4, pg.5 of PAP. <br /> Expansion 2.6 14,,723 2J39Area measured by Division. <br /> Total 4.4 *1 %661 <br /> Reported Volumes for ling I Refuse Pile <br /> Location Area Corer Material Growth Medium dotes <br /> (Acre) (cu. d.) (cu.yd.) I <br /> Stockpile - - 1 , 40 Section .0 .4, pg. 5 of PAP. <br /> Borrow <br /> Area - 16,v940 1.5 acre @ ' depth.Section .0 A, pg. 5 of PAP. <br /> Huntington 50..000 Proposed section .0 .4, pg.SA <br /> Total 50*000 33,, BB Both volumes greater than required. <br /> 1)3. 'required depth <br /> ON required depth <br /> This concludes mar review of Ding's TR-2 , If you have any questions, feel free to <br /> contact m . <br /> Sincerely, <br /> a h TIrujillo <br />