Laserfiche WebLink
Mobilization Worksheet Cont'd Task#004 Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: YUMA <br /> Total one-way travel distance: 40.00 mules <br /> Average Travel Speed: 45.00 mph <br /> Total Non-Roadable Mob/Demob Cost <br /> '*two round trips with haul rig: $4,446.77 <br /> Total Roadable Mob/Demob Cost** $67.32 <br /> **one round trip,no haul rig: <br /> Transportation Cycle Time: <br /> Non-Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 0.89 0.89 <br /> Return Time(Hours): 0.89 0.89 <br /> Loading Time(Hours): 0.25 NA <br /> Unloading Time(hours): 0.25 NA <br /> Subtotals: 2.28 1.78 <br /> JOB TIME AND COST <br /> Total job time: 4.56 Hours <br /> Total job cost: $4,514 <br /> I <br /> CIRCES Cost Estimating Sottwaro <br />