My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-09-12_REVISION - M2007021
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2007021
>
2019-09-12_REVISION - M2007021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:00:24 PM
Creation date
9/12/2019 11:44:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007021
IBM Index Class Name
Revision
Doc Date
9/12/2019
Doc Name
Request For Succession Of Operator
From
Mike Bennett
To
DRMS
Type & Sequence
SO1
Email Name
ECS
MAC
GXB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br /> Page 1 of 2 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Mobilization/Demobilization of Reclamation Equipment <br /> Permit Action: 2015 Reclamation <br /> Site: Bennett Pit Cost Estimate Permit/Jobt M2007021 <br /> PROJECT IDENTIFICATION <br /> Task#: 004 State: Colorado Abbreviation: None <br /> Date: 3/2/2015 County: Yuma Filename: M021-004 <br /> User: ERR <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data ' <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT TRAILER <br /> (25T,50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> OwnersN2 Cost/Hour: $16.63 $18.37 $22.33 <br /> Operating Cost/Hour: $44.38 $46.13 $50.07 <br /> Operator Cost/Hour. $27.66 $27.66 $27.66 <br /> Helper Cost/Hour. $0.00 $25.39 $25.39 <br /> Total Unit Cost/Hour: 1 $88.67 1 $117.55 1 $125.45 <br /> NON ROADABLE EQUIPMENT: <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hrlu dt Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> ONS fleet <br /> Cut DST-8SU 53.08 $69.05 $125.45 1 $194.50 $125:45 $250.00 <br /> Cat 623G 41.35 $75.81 $117.55 1 $193.36 $117.55 $250.00 <br /> DrilMroadcast 25.00 $39.59 $88.67 1 $128.26 $88.67 $250.00 <br /> Seeder with Tractor <br /> Power Mulcher 6.00 $7.03 $88.67 1 $95.70 $88.67 $250.00 <br /> einco M90 <br /> Subtotals: 1 $611.82 $420.34 $1000.00 <br /> ROMA=EQUIPMENT: <br /> Machine Description Total Cost/hr/unit Fleet Size Haul Trip Return Trip <br /> Cost/hr/fleet Cost/hc/fleet <br /> Ught Duty Pickup,4x4 3/4 T. 1 $37.87 1 1 1 $37.87 1 $37.87 <br /> Subtotals: $37.87 $37.87 <br /> CIRCES Cost Estimating Sottw= <br />
The URL can be used to link to this page
Your browser does not support the video tag.