Laserfiche WebLink
• I <br /> i <br /> Scraper Worksheet Cont'd Task#002 Page 1 of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Replace Topsoil <br /> Permit Action: 2015 Reclamation <br /> Site: Bennett Pit Cost Estimate Permit/Job#: W007021 <br /> PROJECT IDENTIFICATION <br /> i <br /> Task#: 002 State: Colorado Abbreviation: None <br /> Date: 3/2/2015 County: Yuma Filename: M021-002 <br /> User. ERR <br /> Agency or organization name: DRMS <br /> I <br /> HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> i <br /> Equipment Description <br /> -Scraper: Cat 623G <br /> -Dozer: NA <br /> Support Equipment-Load Area NA <br /> -Dump Area: Cat D8T-8SU <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck NA <br /> Cost B eakdo Scraper Work Team Support Equi 3ment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA NA 100 NA NA <br /> Ownership cost/hour: $75.81 NA NA $69.05 NA NA <br /> Operating cost/hour: $140.78 NA NA $108.22 NA NA <br /> Ripper op.cost/hour: NA NA NA $1.86 NA NA <br /> Operator cost/hour. $33.56 NA NA $38.01 NA NA <br /> Unit Subtotals: $250.15 NA NA $217.14 NA NA <br /> Number of Units: 1 0 0 1 0 0 <br /> Group Subtotals: I Work: $250.15 Support: 1 $217.14 Maint: $0.00 <br /> Total work team cost/hour.S467.29 <br /> MATERIAL OUAIMTI95 <br /> Initial volume: 3,088 CCY Swell factor: 1.230 <br /> Loose volume: 3,798 LCY <br /> Source of estimated volume: 2007 Operator Estimate <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,100 lbsd= Struck Volume: 18.00 LCY <br /> Material description: Earth-Loam Heaped Volume: 23.00 LCY <br /> Rated Payload: 55,200 pounds Average Volume: 20.50 LCY <br /> Payload Capacity: 26.29 LCY Adjusted Capacity: 20.50 LCY <br /> CiRCES Cost Estimating Software <br />