Laserfiche WebLink
L - <br /> Bulldozer Worksheet Cont'd Task#001 Page 2 of 2 <br /> Spoil pile: 0.800 (FND-l3F) <br /> Push gradient: 1.115 (CAT HB) <br /> Attitude: 1.000 (CAT HB) <br /> Material Weight: 0.868 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.4338 <br /> Adjusted unit production: 607.32 LCY/hr <br /> Adjusted fleet production: 607.32 LCY/hr <br /> JOB TEAE AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $0.358/LCY <br /> Total job time: 35.45 Hours <br /> Total job cost: $7,698 <br /> I <br /> I <br /> I <br />