Laserfiche WebLink
l ' <br /> 77-111-1 w. <br /> W I R 5 4-- <br /> r. <br /> m4 <br /> r i <br /> , <br /> 1, a <br /> . , <br /> , <br /> OL <br /> M <br /> , a <br /> r ,,At• <br /> 'M <br /> ce ,. <br /> :1+a" ,.,..a: ".,Af ° °• i , 'A•'fl e m 'i 'b ," 'VF., k4* Y;o-x <br /> °h <br /> r <br /> r t <br /> y <br /> i . .':.:� .L...n .,.'CnA.m..r.urP3l..,wo.�Atr:c;.` K,.. _'tien•.a]fN...,. .,r +R'r:"'1' rM...i� �M 4 ��� '7..•+.�.'^''h tlTtll.,. <br /> r n <br /> EP058 ST002 <br /> a <br /> ST003 <br /> TOPSOIL—Rule 4.06 <br /> Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br /> Although not specifically addressed in Rule 3.03,the Division evaluates topsoil replacement in conformance with <br /> Rule 4.06 and permit requirements as a component of Phase II bond release. Colowyo is approved for variable <br /> topsoil depth placement and as per Colowyo's PAP. "Topsoil will... ...be redistributed and graded to a variable <br /> replacement depth following the general rule of thin topsoil(<6)inches on ridge tops to gradually thicker topsoil <br /> moving down the slopes to the drainage bottoms for the grazingland land use targeted areas. Sagebrush Steppe <br /> areas will ideally receive an average of approximately 4 inches of topsoil that will likely be more uniform <br /> application to encourage proper seeding depth and overall shrub establishment conditions."Topsoil verification <br /> was done prior to the SL-16 inspection and was documented in the Divisions inspection report dated 8/14/19. All <br /> topsoil verification holes were dug to a minimum of 9 inches or until topsoil was no longer visible. Depths were <br /> dug larger than 9 inches when specified depth average was greater as stated under Section IV. of the SL-16 <br /> application. Since reclamation parcel ST001 was not evaluated as part of this inspection, the topsoil depths will <br /> not be included in this report. The following table and map show the depths and associated location to each topsoil <br /> verification hole: <br />