Laserfiche WebLink
HYDROLOGIC BALANCE -Rule 4.05 <br /> Drainage Control 4.05.1,4.05.2,4.05.3; Siltation Structures 4.05.5,4.05.6; Discharge Structures 4.05.7, 4.05.10; <br /> Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br /> Drainage—Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br /> Colowyo has requested Phase I, II and III on the permanent structures Gulch A Pond and the East Side Collection <br /> Ditch(ESCD). All contributing area to the Gulch A Pond and ESCD has either been Phase III bond released or <br /> received small area exemption status. <br /> The ESCD was entirely walked. The path taken was followed by GPS to ensure the ditch was constructed <br /> accurately as presented in Colowyo's PAP. The ESCD was stable and well vegetated.No signs of erosion was <br /> encountered at any point along the ditch. <br /> The Gulch A Pond was dry at the time of the inspection and remains functional. The pond embankments were <br /> stable, vegetated with no issues observed. <br /> 06 <br /> o*0A, <br /> WA <br /> k <br /> ► . <br /> µ S <br /> � W h <br /> Yi " rk <br /> ° <br /> Ewa" �• _ .'. k <br /> t ° <br /> / A <br /> . 4 J <br /> { <br /> m <br /> r <br /> a <br /> " 1 <br /> 7 "• a <br /> " <br /> , <br /> East Side Collection Ditch Gulch A Pond. <br /> REVEGETATION—Rule 4.15 <br /> Vegetative Cover; Timing: <br /> Revegetation of the requested Phase II parcels were inspected. The parcels inspected were EP058, ST002 and <br /> ST003. Each parcel was well vegetated. Any noxious weed encountered was dead from spraying activities <br /> performed earlier in the year.No signs of erosion was observed in the area. A total of 4 rill repair areas were <br /> observed in EP058. Rill repair is considered normal husbandry practices and the total area repaired was not <br /> representative of parcel EP058. <br /> Colowyo has provided a vegetation cover analysis and sedimentology demonstration to show successful <br /> reclamation per Rules 3.03.3(b) and 4.15.8(3) for Phase II bond release. <br />