Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 000 <br />Weight description: Earth - Dry packed <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.900 <br />(AB.AVG. <br />Material consistency: <br />1.200 <br />(CAT HB) <br />Dozing method: <br />1.000 <br />(GEN.) <br />Visibility: <br />1.000 <br />(AVG.) <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />1.000 <br />(DOZ-OC) <br />Push gradient: <br />1.000 <br />(CAT HB) <br />Altitude: <br />0.930 <br />(CAT HB) <br />Material Weight: <br />0.902 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.7520 <br />Adjusted unit <br />production: <br />Adjusted fleet <br />production: <br />JOB TIME AND COST <br />2,158.47 LCY/hr <br />2158.47 LCY/hr <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.242/LCY <br />Total job time: 11.58 Hours <br />Total job cost: $6,055 <br />Page 4 of 7 <br />CIRCES Cost Estimating Software <br />