My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-31_PERMIT FILE - C1981019A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2019-05-31_PERMIT FILE - C1981019A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 7:13:17 AM
Creation date
9/11/2019 10:05:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
5/31/2019
Doc Name
Cumulative Bond Schedule
Section_Exhibit Name
Exhibit 13C
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet Cont'd Task # 000 <br />BULLDOZER WORK <br />Page 3 of 7 <br />Task description: Regrade Topsoil for TR -121 <br />Site: Colowyo Coal Mine Permit Action: 000 Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 6/26/2018 County: Moffat <br />User: ZTT <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat DI IT - 11U <br />Horsepower: <br />850 <br />Blade Type: <br />Universal <br />Attachment: <br />1 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/flour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Abbreviation: None <br />Filename: C019-002 <br />$242.84 <br />Utilization % <br />NA <br />$200.83 <br />100 <br />$24.60 <br />NA <br />$13.03 <br />100 <br />$41.52 <br />NA <br />Total unit Cost/Hour: $522.81 <br />Total Fleet Cost/Hour: $522.81 <br />MATERIAL QUANTITIES <br />Initial Volume: 25,000 <br />Swell factor: 1.000 <br />Loose volume: 25,000 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: _ <br />Unadjusted hourly <br />production: _ <br />Materials consistency description <br />Average push 0% <br />gradient: <br />Average site altitude <br />Material weight: <br />100 feet <br />2,870.3 LCY/hr <br />7.600 feet <br />Loose stockpile 1.2 <br />550 lbs/LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.