My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-31_PERMIT FILE - C1981019A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2019-05-31_PERMIT FILE - C1981019A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 7:13:17 AM
Creation date
9/11/2019 10:05:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
5/31/2019
Doc Name
Cumulative Bond Schedule
Section_Exhibit Name
Exhibit 13C
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worizheet Cont'd Task # 000 Page 114 of 115 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest MajorCity orTown within project area region: <br />CRAIG <br />Totalone-way traveldistance: <br />50.00 miles <br />Average Travel Speed: <br />45.00 mph <br />Total Non-Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />$118,765.86 <br />Total Roadab le Mob/Demob Cost * * <br />$487.09 <br />* * one round trip, no haul rig: <br />Transportation Cycle Time: <br />Non- <br />Roadable Roadable <br />HaulTime (Hours): 1.11 1.11 <br />Return Time (Hours): 1.11 1.11 <br />Loading Time (Hours): 0.50 NA <br />Unloading Time (Hours): 0.50 NA <br />Subtotals: 3.22 2.22 <br />JOB TIME AND COST <br />Totaljob time: 6.44 Hours <br />Totaljobcost: $119,253 <br />CIRCES Cost Estimating Sotware <br />
The URL can be used to link to this page
Your browser does not support the video tag.