Laserfiche WebLink
Cost Summary Worksheet Cont'd Task# 000 Page 113 of 115 <br />EQUIPMENT MOBILIZATION/DEMOBILIZATION <br />Task description: Mobilize/demobilize equipment from Craig <br />Site: Colowyo Coal Mne Permit Action: 13C (RN7) Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task#: 054 State: Colorado <br />Date: 5/16/2018 County: Moffat <br />User: ZTT <br />Agency or organization name <br />DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Abbreviation: None <br />Filename: CO 19-054 <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON -HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT <br />TRAII ER (25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities <br />0-25 Tons <br />26-50 Tons <br />51+ Tons <br />Ownership Cost/Hour. <br />$16.63 <br />$18.37 <br />$22.33 <br />Operating Cost/Hour: <br />$44.38 <br />$46.13 <br />50.07 <br />eratorCost/Hour: <br />$27.66 <br />$27.66 <br />$27.66 <br />Helper Cost/Hour: <br />$0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost/Hour: 1 <br />$88.67 <br />1 $117.55 1 <br />$125.45 <br />NON ROADABLE EQUIPMENT: <br />59.59 <br />$1 5 4 <br />Machine <br />Weight/ <br />Ownership <br />HaulRig <br />Fleet <br />HaulTrip <br />Return Trip <br />DOT Permit <br />Description <br />Unit <br />Cost/hr/unit <br />Cost/hr/uni <br />Size <br />Cost/hr/ <br />Cost/hr/fleet <br />Cost/ fleet <br />Lube Truck, x4, HP <br />(TONS) <br />41.15 <br />t <br />fleet <br />Cat 637G wpus - <br />59.59 <br />$1 5 4 <br />1 5.45 <br />12 <br />377977- <br />-$1,505.4000 <br />pull <br />Cat D T- 9SU <br />60.01 <br />$100.59 <br />$125.45 <br />4 <br />$904.16 <br />$501.80 <br />$0.00 <br />AT 16M <br />3 <br />$72.40 <br />-775 -5 <br />-T- <br />-TT77.TF- <br />$235.1000 <br />Drill/Broadcast <br />25.00 <br />$12.22 <br />$88.67 <br />2 <br />$201.78 <br />$177.34 <br />$0.00 <br />Seeder with <br />Tractor <br />LET URNEAU <br />3. <br />54.0 <br />25.5 <br />24 <br />508 <br />11,. <br />1,1 <br />L2350 <br />KUM45.00UME <br />1 244.00 <br />1 $186.735.45 <br />21 <br />1 $6,555.78$2,634.45 <br />$980.00 <br />Subtotals: $22,889.3 1 $8,064.89 $2,100.00 <br />4 <br />ROADABLE EQUIPMENT: <br />Machine Description <br />Total Cost/hr/ Fleet Size <br />unit <br />HaulTrip <br />Cost/hr/fleet <br />Return Trip <br />Cost/hr/fleet <br />Water Tanker, 5,000 Gal. <br />$58.14 <br />Flatbed Truck, 4x2, 30K GVW <br />$26.27 1 <br />$26.27 <br />$26.27 <br />Fuel Tanker, 6x4,2 10 HP <br />$35.49 1 <br />5. <br />$35.49 <br />Lube Truck, x4, HP <br />$41.15 <br />41.15 <br />$41.15 <br />Subtotals: 1 $219.19 1 $219.19 <br />CIRCES Cost Estimating SoSware <br />