My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-31_PERMIT FILE - C1981019A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2019-05-31_PERMIT FILE - C1981019A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 7:13:17 AM
Creation date
9/11/2019 10:05:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
5/31/2019
Doc Name
Cumulative Bond Schedule
Section_Exhibit Name
Exhibit 13C
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet Cont'd <br />Task# 000 <br />Unit cost: <br />Job Condition Correction Factor <br />Total job time: <br />Source <br />Operator Skill: <br />0.900 <br />AB.AVG. <br />Material consistency: <br />1.000 <br />CAT HB <br />Dozing method: <br />1.000 <br />(GIN.) <br />Visibility: <br />1.000 <br />AVG. <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />1.000 <br />(DOZ-OC) <br />Push gradient: <br />0.903 <br />(CAT HB) <br />Altitude: <br />0.930 <br />(CAT HB) <br />Material W eight: <br />0.902 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.5658 <br />Adjustedunit <br />production: <br />Adjus ted fleet <br />production: <br />JOB TIME AND COST <br />1,624.02 LCY/hr <br />1624.02 LCY/hr <br />Fleetsize: <br />1 Dozer(s) <br />Unit cost: <br />0.299/LCY <br />Total job time: <br />2.46 Hours <br />Totaljob cost: <br />$1,192 <br />Page 105 of 115 <br />CIRCES Cost Estimating Soffware <br />
The URL can be used to link to this page
Your browser does not support the video tag.