Laserfiche WebLink
Cost Summary Worksheet Cont'd <br />Task# 000 <br />Unit cost: <br />Job Condition Correction Factor <br />Total job time: <br />Source <br />Operator Skill: <br />0.900 <br />AB.AVG. <br />Material consistency: <br />1.000 <br />CAT HB <br />Dozing method: <br />1.000 <br />(GIN.) <br />Visibility: <br />1.000 <br />AVG. <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />1.000 <br />(DOZ-OC) <br />Push gradient: <br />0.903 <br />(CAT HB) <br />Altitude: <br />0.930 <br />(CAT HB) <br />Material W eight: <br />0.902 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.5658 <br />Adjustedunit <br />production: <br />Adjus ted fleet <br />production: <br />JOB TIME AND COST <br />1,624.02 LCY/hr <br />1624.02 LCY/hr <br />Fleetsize: <br />1 Dozer(s) <br />Unit cost: <br />0.299/LCY <br />Total job time: <br />2.46 Hours <br />Totaljob cost: <br />$1,192 <br />Page 105 of 115 <br />CIRCES Cost Estimating Soffware <br />