Laserfiche WebLink
Cost Summary Worksheet Cont'd Task# 000 <br />BULLDOZER WORK <br />Page 104 of 115 <br />Task description: Regrade Topsoil for Taylor Creek Pipe Crossing <br />Site: Colowyo Coal Mne Permit Action: 13C (RN7) Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task#: 050 State: Colorado Abbreviation: None <br />Date: 5/16/2018 County: Moffat Filename: C019-050 <br />User: ZTT <br />Agency or organizationname: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />CatDllT - 11U <br />Horsepower: <br />850 <br />Blade Type: <br />Universal <br />Attachment: <br />1-s hank ripper <br />Shift Basis: <br />1 perday <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripperown. <br />Cost/Hour: <br />Ripperop. Cost/Hour: <br />Operator Cost/flour: <br />Totalunit Cost/Hour: $484.97 <br />Total Fleet Cost/Hour: $484.97 <br />Utilization % <br />$226.13 NA <br />$183.90 100 <br />$21.79 NA <br />$41.85 1 NA <br />MATERIAL QUANTITIES <br />Initial Volume: 3,993 <br />Swell factor: 1.000 <br />Loose volume: 3,993 LCY <br />Source ofestimatedvolume: Division ofReclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly 2,870.3 LCY/hr <br />production: <br />Materials consistency description: Consolidated stockpile 1.0 <br />Averagepush <br />gradient: <br />Averages ite altitude: <br />Materialweight: <br />Weight description: <br />5% <br />7,600 feet <br />2,550 lbs /LCY <br />Earth - Dry packed <br />CIRCES Cost Estimating Software <br />