Laserfiche WebLink
Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.750 <br />AVG.) <br />Material consistency: <br />0.900 <br />CAT HB <br />Dozing method: <br />1.000 <br />(GIN.) <br />Visibility: <br />1.000 <br />AVG. <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />0.800 <br />(FND-RF) <br />Push gradient: <br />1.000 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />MaterialWeight: <br />0.868 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.3890 <br />Adjustedunit 959.82 LCY/hr <br />production: <br />Adjustedfleet 959.82 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: 0.471/LCY <br />Totaljob time: 63.87 Hours <br />Totaljob cost: $28,860 <br />Page 47 of 115 <br />CIRCES Cost Estimating SoSware <br />