Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 000 Page 99 of 115 <br />Truck Cvcle Time: <br />Truck Exchange Time: 0.80 Minutes Adjusted for s ite altitude: 0.800 Minutes <br />Truck Load Time: 1.450 Minutes Adjus ted for s ite altitude: 1.480 Minutes <br />Tru ck Maneuver and Dump 1.20 Minutes Adjus ted for s ite altitude: 1.200 Minutes <br />Time: <br />Tru ckTravel (Haul& Return) Time: Road Condition: Firm smooth, rolling, dirt/It. surfaced. watered <br />maintained 3.0 <br />Haul Route: <br />Seg # <br />HaulDistance Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />min <br />1 <br />5144.00 -3.00 <br />mm <br />1 <br />5144.00 3.00 <br />1 3.00 <br />1 6.00 <br />1266 <br />4.238 <br />HaulTime: 4.238 minutes <br />RPtnrn Rnute- <br />Seg # <br />HaulDistance Grade (%) <br />Roll. Res <br />Total Res Velocity <br />Travel <br />(Ft) <br />(%) <br />(%) (fpm) <br />Time <br />min <br />1 <br />5144.00 -3.00 <br />3.00 <br />0.00 3503 <br />1.672 <br />Return Time: 1.672 minutes <br />Total Truck Cycle Time: 9.390 minutes <br />Loading Toolunit <br />Production 4,603.46 LCY/Hour Adjustedforjob efficiency: 3,820.87 LCY/Hour <br />Truck Unit Production <br />1,117.62 LCY/Hour Adjustedforjob efficiency: 927.62 LCY/Hour <br />Optimal No. ofTrucks: 4 Truck(s) Selected NumberofTrucks: 4 Truck(s) <br />Adjustedhourlytruckteamproduction: 3,710.50 LCY/Hour <br />Adjustedsingletruck/loaderteamproduction: 3,710.50 LCY/Hour <br />Adjustedmultipletruck/loaderteamproduction: 3,710.50 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.084 /LCY <br />Totaljobtime: 187.29 Hours <br />Totaljob cost: $753,037 <br />CIRCES Cost Estimating SoSware <br />