My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-31_PERMIT FILE - C1981019A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2019-05-31_PERMIT FILE - C1981019A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2019 10:10:03 AM
Creation date
9/11/2019 9:50:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
5/31/2019
Doc Name
Cumulative Bond Schedule
Section_Exhibit Name
Exhibit 13C
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck Travel (Haul & Return) Time: <br />maintained 2.0 <br />Haul Route: <br />Page 96 of 115 <br />Road Condition: Hard. smooth stabilized, surfaced. watered. <br />Seg # <br />HaulDistance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />(Ft) <br />(%) <br />(%) <br />(%) <br />(fpm) <br />Time <br />1,408.29 LCY/Hour Adjustedforjob efficiency: <br />mm <br />1 <br />3940.00 <br />mm <br />1 <br />3940.00 <br />3.00 <br />2.00 <br />5.00 <br />1550 <br />2.812 <br />Haul Time: 2.812 <br />Return Route: <br />minutes <br />Seg # <br />HaulDistance <br />Grade (%) <br />Roll. Res <br />Total Res Velocity <br />Travel <br />Loading Toolunit <br />(Ft) <br />(%) <br />(%) (fpm) <br />Time <br />Truck Unit Production <br />1,408.29 LCY/Hour Adjustedforjob efficiency: <br />mm <br />1 <br />3940.00 <br />1 -3.00 <br />1 2.00 <br />1 -1.00 1 3503 11.160 <br />Adjustedhourly truck teamproduction: 4,675.52 LCY/Hour <br />Adjusted single truck/loaderteamproduction: 3,820.87 LCY/Hour <br />Adjustedmultipletruck/loaderteamproduction: 3,820.87 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 3,974.88 Hours <br />Unit cost: $1.052 /LCY Totaljobcost: $15,981,450 <br />CIRCES Cost Estimating Solware <br />Return Time: 1.160 <br />minutes <br />Total TruckCycle Time: 7.452 <br />minutes <br />Loading Toolunit <br />Production <br />4,603.46 LCY/Hour Adjustedforjob efficiency: <br />3,820.87 LCY/Hour <br />Truck Unit Production <br />1,408.29 LCY/Hour Adjustedforjob efficiency: <br />1,168.88 LCY/Hour <br />Optimal No. ofTrucks: <br />3 Trucks) Selected NumberofTrucks: <br />4 Truck(s) <br />Adjustedhourly truck teamproduction: 4,675.52 LCY/Hour <br />Adjusted single truck/loaderteamproduction: 3,820.87 LCY/Hour <br />Adjustedmultipletruck/loaderteamproduction: 3,820.87 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 3,974.88 Hours <br />Unit cost: $1.052 /LCY Totaljobcost: $15,981,450 <br />CIRCES Cost Estimating Solware <br />
The URL can be used to link to this page
Your browser does not support the video tag.