My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-31_PERMIT FILE - C1981019A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2019-05-31_PERMIT FILE - C1981019A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2019 10:10:03 AM
Creation date
9/11/2019 9:50:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
5/31/2019
Doc Name
Cumulative Bond Schedule
Section_Exhibit Name
Exhibit 13C
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Payload Capacity: 185.74 LCY <br />Truck Bed (volume) Basis <br />Struck Volume: <br />153.00 <br />LCY <br />Heaped Volume: <br />192.00 <br />LCY <br />Average Volume: <br />172.50 <br />LCY <br />Adjusted Volume: <br />185.74 <br />LCY <br />Final Truck Volume Based on Number ofLoader Passes: <br />Loading Tool Capacity <br />174.90 <br />Page 95 of 115 <br />Bucket Size Class: NA <br />Rated Capacity: 53.000 LCY (heaped) <br />Bucket Fill Factor: 1.100 Other- rock/dirt mvdures 100-120% 1.100 <br />Adjusted Capacity: 58.300 J LCY <br />Job Condition Corrections: Site Altitude (ft.): 7600 feet <br />Truck Loader Source <br />Altitude Ad: 1.000 0.980 CAT HB <br />Job Efficiencv: 0.830 0.830 (CAT HB) <br />Net Correction: <br />Loading Tool Cycle Time: Number of Loading ToolPasses Required to Fill <br />Truck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Lo aders —Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />LCY <br />3 passes <br />Wheel and Track Loaders -Unadjusted Basic Loader Cycle Time (load,dump, 0.725 minutes <br />maneuver): <br />Cycle Time Factors <br />0.800 <br />Factor min. <br />Source <br />Material: <br />Material 6" and over diameter 0.03 <br />0.030 <br />Cat HB <br />Stockpile: <br />Conveyor or dozer piled 10 ft. high and up <br />0.00 <br />0.000 <br />(Cat HB) <br />Truck Ownership: <br />Common ownership oftrucksand loaders - <br />0.04 <br />-0.040 <br />(Cat HB) <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />Cat HB <br />Net lycle 1 rule AaJustment: -UMU minutes <br />Adjusted Loader Cycle Time: 0.675 minutes <br />Net Load Time per Truck: 1.450 minutes <br />Truck Cvcle Time: <br />Truck Exchange Time: 0.80 Minutes <br />Truckload Time: 1.450 Minutes <br />Truck Maneuver and Dump 1.20 Minutes <br />Time: <br />Adjusted for s ite altitude: <br />0.800 <br />Minutes <br />Adjustedforsitealtitude: <br />1.480 <br />Minutes <br />Adjustedforsitealtitude: <br />1.200 <br />Minutes <br />CIRCES Cost Estimating So$ware <br />
The URL can be used to link to this page
Your browser does not support the video tag.