Laserfiche WebLink
Page 65 of 73 <br /> 18" Culvert Removal 266 LF Pipe,corrugated metal 266.00 LF $4.58 $11218.73 <br /> (CMP)- 18 in. <br /> diameter pipe <br /> 24" Culvert Removal 1,110 LF Pipe,corrugated metal 1,110.00 LF $5.94 $61598.28 <br /> (CMP)- 24 in. <br /> diameter pipe <br /> 36" Culvert Removal 82 LF Pipe,corrugated metal 82.00 LF $9.23 $756.92 <br /> (CMP)- 36 in. <br /> diameter pipe <br /> 96" Culvert Over 70 LF Pipe,reinforced 70.00 LF $85.97 $61018.06 <br /> Loading Conveyor concrete(RCP) - 96 in. <br /> diameter pipe <br /> Remove Bridge Over 150'x25' Bridge Demolition- 3,750.00 SF $18.30 $681625.00 <br /> Reed Wash Concrete <br /> Clean-Up Material Assume 25 CY Loading and 2 mile 25.00 CY $17.55 $43 8.75 <br /> Storage Area haul,no salvage- <br /> Machine loading <br /> Remove Silt Fence Assume 2,400 Dump fees-Rubbish 150.00 CY $9.45 $11417.50 <br /> around Loadout LF only <br /> Total Cost <br /> Subtotal (adjusted for <br /> Job Hours: 400.00 (unadjusted): $3229043.73 location): $2949025.93 <br />