Laserfiche WebLink
Page 64 of 73 <br /> pit,2.0 ft.x 3 ft. -Max. <br /> 200 ft.push <br /> -Railroad Track 11,900 LF Railroad track-Ties 11,900.00 LF $9.36 $1111384.00 <br /> and track <br /> -Ballast 2 644 CY Railroad track-Ballast 21644.00 CY $4.7 8 $121 63 8.3 2 <br /> Stacker Conveyor 180 LF OBSOLETE-Conveyor, 180.00 LF $44.51 $81011.62 <br /> elevated,including <br /> supports-5 ft.W x 6 <br /> ft. H housing <br /> Radial Stacker 160 LF OBSOLETE-Conveyor, 160.00 LF $44.51 $71121.44 <br /> Conveyor elevated,including <br /> supports-5 ft.W x 6 <br /> ft. H housing <br /> Loading Conveyor 570 LF OBSOLETE-Conveyor, 570.00 LF $53.42 $301449.40 <br /> elevated,including <br /> supports- 8 ft.W x 10 <br /> ft. H housing <br /> Reclaim Tunnel 12'x330'x12" Demo. and on-site 15,840.00 SF $1.98 $31,295.09 <br /> (4) disposal in excavated <br /> pit, 12 in.thick-Max. <br /> 200 ft.push <br /> -Escape Tube 42" x 90 LF Pipe,corrugated metal 90.00 LF $13.31 $11198.22 <br /> (CMP)- 48 in. <br /> diameter pipe <br /> Coal Sampling 8'x20'x8' Bldg. (SN)demo./on- 1,280.00 CF $0.20 $252.16 <br /> Building site disposal in <br /> excavated pit-Max. <br /> 200 ft.push <br /> -Floor 8'x20'x6" Demo. and on-site 160.00 SF $0.93 $149.42 <br /> disposal in excavated <br /> pit, 6 in.thick-Max. <br /> 200 ft.push <br /> Shop/Office Trailer 8'x40'x8' Bldg. (SN)demo./on- 29560.00 CF $0.20 $504.32 <br /> site disposal in <br /> excavated pit-Max. <br /> 200 ft.push <br /> MCC Building 8'x20'x8' Bldg. (SN)demo./on- 29560.00 CF $0.20 $504.32 <br /> site disposal in <br /> excavated pit-Max. <br /> 200 ft.push <br /> -Floor 8'x20'x12" Demo. and on-site 160.00 SF $1.87 $298.85 <br /> disposal in excavated <br /> pit, 12 in.thick-Max. <br /> 200 ft.push <br /> -Footing 2'x3'x56 LF Demo. and on-site 56.00 LF $10.71 $599.80 <br /> disposal in existing pit, <br /> 2.0 ft.x 3 ft. -Max. 200 <br /> ft.push <br /> 6,000 Gallon Fuel 6,000 Gallons Comprehensive storage 1.00 EA $51305.15 $51305.15 <br /> Tank tank removal,non- <br /> leaking-6,000 to <br /> 8,000 gal.tank <br /> Power Lines 1,000 LF Powerline or utility line 3.25 EA $11701.00 $51528.25 <br /> - Structural Steel Box <br /> Type Frame Structure <br /> Dismantle and Dispose <br /> -Transformer 1 EA NON-PCB Transformer 1.00 EA $2,107.20 $21107.20 <br /> Removal <br />