Laserfiche WebLink
Amended Aggregate Industries South Platte Combined SWSP August 27, 2019 <br /> Plan I Ds 3614, 47731 3624, 47721 4616, 3437, 3376, 3650, 3668, and 5475 Page 16 of 21 <br /> acres of water surface area decreed in case no. <br /> 1990CW23 (site currently exposes 36 acres). <br /> F-Street Pit Groundwater Lake $10 237 994 1 or 3 Bond amount increased to cover the cost of <br /> ' backfi lli ng the site. <br /> Conditions of Approval <br /> I hereby approve this substitute water supply plan, in accordance with 5 37-90-137(11), <br /> C.R.S., subject to the following conditions: <br /> 1. This SWSP shall be valid for the period of August 27, 2019 through December 31, 2019, unless <br /> otherwise revoked or superseded by decree. Should a request for renewal of this plan be <br /> needed, such renewal request must be submitted to this office with the statutory fee <br /> (currently $257 per pit) no later than November 1, 2019. If a renewal request is received <br /> after the expiration date of this plan, it may be considered a request for a new SWSP in <br /> which case the filing fee for a new SWSP will apply (currently $1,157 per pit). <br /> 2. The Applicant must contact the District 2 Water Commissioner to arrange a field <br /> inspection of the South Platte Operations. <br /> 3. Well permits have been obtained for the current use and exposed groundwater surface area of <br /> each gravel pit in accordance with 5 37-90-137(2) and (11), C.R.S., as identified in Table A of <br /> this approval. <br /> 4. The total area of groundwater surface exposed after December 31, 1980 for each of the pits <br /> shall not exceed those values listed in Table A of this approval. Should the total surface area <br /> exposed exceed those amounts, an amendment will need to be filed with this office. <br /> 5. The total amount of groundwater to be consumed at each of the pits shall not exceed the <br /> values listed in Table C of this approval. Total consumption at each pit must not exceed <br /> these amounts unless an amendment is made to this plan. <br /> 6. Approval of this plan is for the purposes as stated herein. This office must first approve any <br /> additional uses for the water. Any future additional historic consumptive use credit given <br /> (e.g., agricultural water transfer) for these sites must consider all previous credits given. <br /> 7. All releases of replacement water must be sufficient to cover all out-of-priority depletions in <br /> time, place, and amount and must be made under the direction and/or the approval of the <br /> water commissioner(s). If approved prior, the release of replacement water may be <br /> aggregated to maximize beneficial use. The water commissioner(s) and/or the division <br /> engineer shall determine the rate and timing of an aggregated release. <br /> 8. Conveyance loss for delivery of replacement water is subject to assessment and modification <br /> as determined by the division engineer. The distance for assessment of conveyance loss will <br /> be based upon DWR stream miles or as approved by the Water Commissioner, and will be <br /> assessed from the point of release to the point of depletion/replacement. <br /> 9. The replacement water, which is the subject of this plan cannot be sold or leased to any <br /> other entity. As a condition of subsequent renewals of this substitute water supply plan, the <br /> replacement water must be appurtenant to these sites until a plan or plans for augmentation <br /> are obtained. All replacement water must be concurrent with depletions in quantity, timing, <br /> and locations. According to an affidavit dated February 29, 2012, the Applicant dedicated the <br /> 13.5 shares of the Whitney Ditch Company and 96 shares of the Fulton Irrigating Ditch <br /> Company as replacement water solely for this SWSP for as long as there are depletions at <br /> these gravel pit sites or until such time as another replacement source is obtained. For the <br />