My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-28_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-08-28_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 3:25:45 AM
Creation date
8/28/2019 2:16:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
8/28/2019
Doc Name
Second Adequacy Review for #s 1 & 2. #3 Response
From
CC&V
To
DRMS
Type & Sequence
TR117
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont-Cripple Creek&Victor Gold Mine <br /> Technical Specification No.01050.DOCX 15 <br /> Squaw Gulch VLF <br /> Project No.475.0106.006 <br /> June 15,2016 <br /> change in fill or synthetic material type, and any other aspect of the work to facilitate <br /> construction and as required by the MANAGER. <br /> B. Submittals By CONTRACTOR Upon Completion of Work: <br /> Within seven (7) calendar days after completion of the WORK, CONTRACTOR shall <br /> furnish MANAGER with "Record Drawings" (also referred to as "As-Built Drawings") of <br /> the Work. The Record Drawing will be drawn at a scale of 1-inch equals 100 feet with <br /> 10 foot topographic contour interval, and on a 24-inch by 36-inch sheet. All surveying <br /> Record Drawings shall be signed and sealed by the Colorado licensed surveyor who <br /> directed the work. The required surveying shall be carried out on a 100-foot by 100- <br /> foot grid with additional survey points required to define valley leach facility <br /> topographic features (i.e., toe of slope, crest of slope, breaks in grade), unless <br /> otherwise directed by MANAGER. The Record Drawings shall include elevations and <br /> locations for the following: <br /> ■ Underdrain plan view showing the limits of the valley leach facility. Underdrain Fill <br /> and underdrain alignment, with elevations every approximately 100 feet or on every <br /> break in grade <br /> ■ Diversion channel plan and profile view along the diversion channel alignment <br /> ■ Leak detection trench plan view showing the limits of the valley leach facility, leak <br /> detection trench alignment, and leak detection sumps, with elevations every <br /> approximately 100-feet <br /> ■ Soil Liner Fill plan view showing the limits of the valley leach facility, with contours <br /> of the Soil Liner Fill and Bedding Fill surface on a 10-foot contour interval, including <br /> the regraded ore slopes and end berms <br /> ■ Low Volume Solution Collection piping plan showing the limits of the composite <br /> liner, double liner and single liner, and piping alignment with elevations every <br /> approximately 100 feet <br /> ■ Perimeter access roads <br /> ■ Top of Upper geosynthetics in the Pregnant Solution Storage Area, including the <br /> Vertical Riser Sump and base plates <br /> ■ High Volume Solution Collection piping plan showing the limits of the VLF, and piping <br /> alignment with elevation every approximately 100-feet <br /> In addition, the Colorado licensed surveyor will provide a surveyor's certificate to be <br /> submitted in the Construction Certification Report. <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.