My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-28_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-08-28_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 3:25:45 AM
Creation date
8/28/2019 2:16:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
8/28/2019
Doc Name
Second Adequacy Review for #s 1 & 2. #3 Response
From
CC&V
To
DRMS
Type & Sequence
TR117
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont-Cripple Creek&Victor Gold Mine <br /> Technical Specification No.01050.DOCX <br /> Squaw Gulch VLF ■ <br /> Project No.475.0106.006 <br /> June 15,2016 <br /> SECTION 01050.0 CONSTRUCTION STAKING AND CONSTRUCTION DOCUMENTATION <br /> 1. PART 1: GENERAL <br /> 1.1. Summary <br /> This Section defines the control staking services required by the CONTRACTOR. All staking and <br /> surveying will be the responsibility of the CONTRACTOR unless otherwise specifically defined in <br /> this section. All grade checking and transferring of lines and grades from CC&V's stakes will be <br /> the CONTRACTOR'S responsibility. <br /> 1.2. Control Stakes <br /> Control stakes which are reference points for all construction work will be conspicuously <br /> marked. It shall be the responsibility of the CONTRACTOR to inform his employees and his <br /> subcontractors of their importance and the necessity for their preservation. At least forty-eight <br /> (48) hours written advance request for removal of control stakes shall be given to CC&V. A total <br /> of ten (10) control stakes will be provided to the CONTRACTOR by CC&V for this work. <br /> Control stakes shall be set one time only. <br /> 1.3. Flagging Code <br /> A color code will be established by the CONTRACTOR during the course of the project indicating <br /> specific colors for the various kinds of stakes to be set. <br /> 1.4. Staking <br /> A. CC&V will provide vertical and horizontal reference control stakes in the proximity of <br /> the work as discussed in Article 1.02 of this Section. <br /> B. The CONTRACTOR shall be responsible for setting construction and grade stakes and for <br /> proper preservation of control points. <br /> C. The CONTRACTOR will provide as-built coordinates and elevations for the Underdrains, <br /> Leak Detection system, Low Volume Solution Collection piping and High Volume <br /> Solution Collection piping or as requested by the MANAGER. <br /> 1.5. Construction Certification Documentation <br /> A. The CONTRACTOR shall be responsible for accurately surveying the locations and <br /> elevations, and where applicable, the type, thickness, and geometry of any and all pipes <br /> and fittings, ditches, geosynthetic materials, breaks in fill or cut slopes, general grading, <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.