My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-26_INSPECTION - C1996083
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1996083
>
2019-08-26_INSPECTION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 12:14:46 PM
Creation date
8/26/2019 1:12:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Inspection
Doc Date
8/26/2019
Doc Name
Inspection Report
From
DRMS
To
Bowie Resources, LLC
Inspection Date
8/22/2019
Email Name
RDZ
JDM
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 22, 2019 C-1996-083/Bowie No. 2 Mine RDZ <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> N -Air Resource Protection R -Roads <br /> N -Availability of Records Y -Reclamation Success <br /> NA -Backfill&Grading R -Revegetation <br /> NA -Excess Spoil and Dev. Waste N - Subsidence <br /> NA -Explosives R - Slides and Other Damage <br /> N -Fish&Wildlife R - Support Facilities On-site <br /> R -Hydrologic Balance R - Signs and Markers <br /> Y -Gen. Compliance With Mine Plan NA - Support Facilities Not On-site <br /> N -Other NA - Special Categories Of Mining <br /> R -Processing Waste R -Topsoil <br /> COMMENTS <br /> A partial inspection was conducted by Janet Binns and Rob Zuber of DRMS on August 22, 2019. The weather was <br /> warm, and the ground was dry. <br /> The Wolverine Fuels (BRL)representative who participated in the field inspection was Basil Bear. <br /> Oxbow Mining, LLC staff(including Mike Ludlow)were on site at the bench above the D Portal to test the <br /> methane flare system. <br /> HYDROLOGIC BALANCE -Rule 4.05 <br /> Drainage Control 4.05.1,4.05.2,4.05.3; Siltation Structures 4.05.5,4.05.6; Discharge Structures 4.05.7, 4.05.10; <br /> Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br /> Drainage—Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br /> The following ponds were inspected: B, C, D, J, and F. None of the ponds were discharging, and no problems <br /> were identified with embankments, spillways, or other features of the ponds (except trees on Pond J as noted <br /> below). Particular comments on the ponds: <br /> Pond B was holding a small volume of water. The pump was not operating. <br /> Pond C was holding a small volume of water. The pump was not operating. <br /> • Pond D was empty. <br /> • Pond J was holding a significant volume of water. It receives flows from the Gob Pile#3 underdrain and <br /> from seepage from the Fire Mountain Canal. Trees/shrubs on the embankment are not optimal, and this structure <br /> should be watched closely; small trees and shrubs should be killed. <br /> • Pond F was holding a significant volume of water. <br /> A portion of Ditch D-F4 requires attention due to extensive erosion. At some locations,the ditch is approximately <br /> seven feet deep, and banks are near vertical. Basil Bear discussed the possibilities of rip rapping the entire channel <br /> Number of Partial Inspection this Fiscal Year: 2 <br /> Number of Complete Inspections this Fiscal Year: 0 <br /> Page 2 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.