My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-23_REVISION - M1980244 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-08-23_REVISION - M1980244 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 12:24:35 PM
Creation date
8/26/2019 1:01:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
8/23/2019
Doc Name
Adequacy Review Response #3
From
CC&V
To
DRMS
Type & Sequence
TR117
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek&Victor Gold Mining Company <br /> Squaw Gulch VLF Phase 2A Part 1 ■ <br /> Record of Construction Report <br /> 475.0106.032 <br /> August 21,2019 <br /> all aspects of the geomembrane installation were performed in accordance with project <br /> Technical Specifications. Geomembrane Acceptance Forms are presented in Appendix <br /> K.8. <br /> 4. PROJECT DEVIATIONS <br /> Throughout construction, the following deviations from the Design and IFC Drawings were <br /> approved by the Engineer of Record: <br /> ➢ Several localized grading, underdrain alignment and HVSCS alignment changes were <br /> made throughout construction in orderto better accommodate the actual site conditions. <br /> The grading changes were minor and are presented in the Record of Construction <br /> Drawings. <br /> ➢ IFC Drawings A60 and A62 indicated that a fusion weld should be used between the <br /> phased geomembrane connections; however, the use of extrusion welding was also <br /> approved. <br /> S. ENGINEER'S OPINION <br /> Based on the construction activities observed, testing performed, and inspections completed, <br /> NewFields certifies that the project was constructed in general accordance with the approved IFC <br /> Drawings and Technical Specifications. <br /> P:\Projects\0106.032 VLF2 Phase 2 COA\J-REPORTS\Cert Report-Phase 2A Part 1\DRMS Comments\475.0106.032 CCV PHASE 2A Part 1 <br /> ROC REPORT_Revl.docx <br /> Page 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.