Laserfiche WebLink
'11-� <br /> NEWMONT <br /> GOLDCORP <br /> Appendix JA includes an inventory of all geomembrane rolls used within Phase <br /> 2A Part 1. All 666,080 square feet of geomembrane in Phase 2A Part 1 is a part of <br /> the 801,550 square feet indicated in Appendix J.1. The excess amount of <br /> geomembrane was either saved for the next phase of construction or considered <br /> waste material. <br /> 4. Section 4 Proiect Deviations: The first bullet states the project technical specifications <br /> were sent to DRMS on July 7, 2016. Section 1.4 states the project specifications were <br /> updated in August of 2016. The August 2016 specifications are those the DRMS <br /> approved as part of TR-78. Are the deviations to the project with respect to the August or <br /> July specifications? <br /> The report has been revised to address this comment. The specified statement was <br /> removed from the report. <br /> Drawings: <br /> 5. Soil Liner Fill Asbuilt, Sheet No. 2 of 3: One of the major contours on this drawing is <br /> labeled 9770. It appears it should be 9700. Please clarify and correct as appropriate. <br /> The enclosed drawing has been updated to show the fixed contour elevations. <br /> Appendices: <br /> 6. Appendix K-5.1: Please address the following discrepancies: <br /> Attachment 12 includes the revised Fusion Welding Destructive Testing Summary. <br /> If a failing destructive test occurs, additional destructive tests with the suffix —N <br /> indicating `next' and with the suffix —P indicating `previous' are marked, cut and <br /> tested in order to identify the extent of the failed seam. <br /> a. In the destructive testing there are two samples that have failing tests, DF-823 <br /> and DF-825. In the subsequent tests there are tests that end in—N and—P. What <br /> are these indicating and update the tables with these clarifications? <br /> b. The seam number for DR863 is incorrect, it is listed as P-2557/P-2558 when it <br /> should be P-2657/P-2658, please verify and update the table as needed. <br /> Attachment 12 includes the corrected location for DF863 as P-2657/P-2658. <br /> 7. Appendix K-5.2: The definitions for the superscript2 is missing, please update the table <br /> with this definition. <br /> Attachment 13 includes the revised Extrusion Welding Destructive Testing Summary <br /> with removal of the specified superscript. <br />