My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-23_REVISION - M1980244 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-08-23_REVISION - M1980244 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 12:24:35 PM
Creation date
8/26/2019 1:01:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
8/23/2019
Doc Name
Adequacy Review Response #3
From
CC&V
To
DRMS
Type & Sequence
TR117
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'11-� <br /> NEWMONT <br /> GOLDCORP <br /> Appendix JA includes an inventory of all geomembrane rolls used within Phase <br /> 2A Part 1. All 666,080 square feet of geomembrane in Phase 2A Part 1 is a part of <br /> the 801,550 square feet indicated in Appendix J.1. The excess amount of <br /> geomembrane was either saved for the next phase of construction or considered <br /> waste material. <br /> 4. Section 4 Proiect Deviations: The first bullet states the project technical specifications <br /> were sent to DRMS on July 7, 2016. Section 1.4 states the project specifications were <br /> updated in August of 2016. The August 2016 specifications are those the DRMS <br /> approved as part of TR-78. Are the deviations to the project with respect to the August or <br /> July specifications? <br /> The report has been revised to address this comment. The specified statement was <br /> removed from the report. <br /> Drawings: <br /> 5. Soil Liner Fill Asbuilt, Sheet No. 2 of 3: One of the major contours on this drawing is <br /> labeled 9770. It appears it should be 9700. Please clarify and correct as appropriate. <br /> The enclosed drawing has been updated to show the fixed contour elevations. <br /> Appendices: <br /> 6. Appendix K-5.1: Please address the following discrepancies: <br /> Attachment 12 includes the revised Fusion Welding Destructive Testing Summary. <br /> If a failing destructive test occurs, additional destructive tests with the suffix —N <br /> indicating `next' and with the suffix —P indicating `previous' are marked, cut and <br /> tested in order to identify the extent of the failed seam. <br /> a. In the destructive testing there are two samples that have failing tests, DF-823 <br /> and DF-825. In the subsequent tests there are tests that end in—N and—P. What <br /> are these indicating and update the tables with these clarifications? <br /> b. The seam number for DR863 is incorrect, it is listed as P-2557/P-2558 when it <br /> should be P-2657/P-2658, please verify and update the table as needed. <br /> Attachment 12 includes the corrected location for DF863 as P-2657/P-2658. <br /> 7. Appendix K-5.2: The definitions for the superscript2 is missing, please update the table <br /> with this definition. <br /> Attachment 13 includes the revised Extrusion Welding Destructive Testing Summary <br /> with removal of the specified superscript. <br />
The URL can be used to link to this page
Your browser does not support the video tag.