Laserfiche WebLink
NEWMONT <br /> GOLDCORR <br /> Table of Contents Report Section/ Actual "Record"Drawings <br /> Reference <br /> RECORD TOP OF SOIL Sect. 2.7/Record Sheen No 1 of 3 Soil Liner Fill Asbuilt <br /> DRAWING NO. 1 LINER FILL AS- Drawing No. 1 <br /> OF 6 BUILT <br /> Sheet No 2 of 3 Soil Liner Fill Asbuilt <br /> Sheet No 3 of 3 Soil Liner Fill Asbuilt <br /> RECORD UNDERDRAIN Sheet 2.3/ Sheet No 1 of 1 Underdrain Asbuilts <br /> DRAWING NO. 2 AS-BUILT Record Drawing <br /> OF 6 No. 2 <br /> RECORD HIGH VOLUME Sect. 2.10/ Sheet No 1 of 3 High Volume <br /> DRAWING NO. 3 SOLUTION Record Drawing Collection Pipe <br /> OF 6 COLLECTION No. 3 Asbuilts <br /> SYSTEM AS- <br /> BUILT <br /> Sheet No2 of 3 High Volume <br /> Collection Pipe <br /> Asbuilts <br /> Sheet No 3 of 3 High Volume <br /> Collection Pipe <br /> Asbuilts <br /> RECORD LEAK Sect. 2.6/Record Sheet No 1 of 1 Leak Detection <br /> DRAWING NO. 4 DETECTION Drawing No. 4 Trench Asbuilts <br /> OF 6 TRENCH AS- <br /> BUILT <br /> RECORD GEOMEMBRANE Sect. 2.8/Record Drawing No. 5 Geomembrane <br /> DRAWING NO. 5 PANEL LAYOUT Drawing No. 5 Panel Layout As- <br /> OF 6 AS-BUILT Built <br /> RECORD DRAIN COVER Sect. 2.11/ Drawing No. 6 Drain Cover Fill As- <br /> DRAWING NO. 6 FILL AS-BUILT Record Drawing Built Isopach <br /> OF 6 ISOPACH No. 6 <br /> a. The inconsistencies between the drawing numbers and nomenclature need to be <br /> corrected. <br /> The report has been revised to reference the Post 2019 Record Drawings and <br /> addresses the specified discrepancies. <br /> 3. Section 2.8 Geomembrane: Please clarify that the 666,080 sgft of liner being reviewed in <br /> Phase 2A part 1 is part of the 801,550 sgft indicated in App J-1. <br />