My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-23_REVISION - M1980244 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-08-23_REVISION - M1980244 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 12:24:35 PM
Creation date
8/26/2019 1:01:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
8/23/2019
Doc Name
Adequacy Review Response #3
From
CC&V
To
DRMS
Type & Sequence
TR117
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek&Victor Gold Mining Company <br /> Squaw Gulch VLF Phase 2A Part 1 ■ <br /> Record of Construction Report <br /> 475.0106.032 <br /> August 21,2019 <br /> Volvo A30 Haul Truck Edge TRT622 Trommel <br /> CAT 740 Haul Trucks Tandem Axle Water Trucks <br /> CAT 777 Haul Trucks CAT 740 Water Truck <br /> CAT 773 Water Wagon <br /> 2.1. Clearing and Grubbing <br /> The footprint of the Phase 2A Part 1 Squaw Gulch VLF was stripped of all deleterious materials. <br /> Any soil containing vegetation was removed and placed in several site topsoil stockpiles <br /> designated by CC&V. All cleared areas were inspected by the CQA Monitor to ensure that all <br /> deleterious material was removed prior to further construction activities. <br /> 2.2. Underground Working Remediation <br /> Historic underground workings within the Squaw Gulch VLF Phase 2 footprint were remediated <br /> in accordance with IFC Drawing A38 and the project Technical Specifications. IFC Drawings, A30 <br /> through A38, present all historic underground workings that were known at the start of <br /> construction. All underground workings that were encountered within the Phase 2 limits during <br /> construction were given a unique identification number and are summarized in the table <br /> presented in Appendix D.1. The table includes the historic identification number, identification <br /> number, location (northing, easting, and surface elevation), type of working, remediation type, <br /> remediation quantities and remarks regarding the remediation. Workings were only identified if <br /> they were within 50 feet of the finished subgrade surface. Investigation and remediation were <br /> not required for any workings that exist at a depth greater than 50 feet below the finished <br /> subgrade surface. Appendix D.2 contains a layout of all underground workings that were <br /> remediated within the Phase 2 limits. <br /> 2.2.1. Confirmatory Drilling <br /> Confirmatory drilling was performed at all workings that were known or encountered <br /> during Phase 2 construction in order to help define the limits of the working. The goal of <br /> the confirmatory drilling was to isolate the working so that the proper remediation could <br /> be completed. <br /> Pneumatic hammer track drill rigs were used to drill three-inch diameter holes, on a 4- <br /> foot grid, to a depth of 50 feet from the pad finished grade elevation. If drilling activities <br /> indicated that 50 feet of crown pillar existed above the working, then the drill hole was <br /> marked as a "miss." If any voids were encountered during drilling, then the drill hole was <br /> marked as a "hit," and the void depths were recorded. After the working was <br /> encompassed by "misses," a remediation plan was developed for the working. <br /> P:\Projects\0106.032 VLF2 Phase 2 CQA\1-REPORTS\Cert Report-Phase 2A Part 1\DRMS Comments\475.0106.032 CCV PHASE 2A Part 1 <br /> ROC REPORT_Revl.docx <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.