My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-23_REVISION - M1980244 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-08-23_REVISION - M1980244 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 12:24:35 PM
Creation date
8/26/2019 1:01:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
8/23/2019
Doc Name
Adequacy Review Response #3
From
CC&V
To
DRMS
Type & Sequence
TR117
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek&Victor Gold Mining Company <br /> Squaw Gulch VLF Phase 2A Part 1 ■ <br /> Record of Construction Report <br /> 475.0106.032 <br /> August 21,2019 <br /> other information contained herein without the express written consent of CC&V understands <br /> and acknowledges that NewFields is not liable for any claim arising out of such use. <br /> 2. SQUAW GULCH VLF CONSTRUCTION ACTIVITIES <br /> Ames and Tezak performed construction activities during the Squaw Gulch VLF project, excluding <br /> geomembrane installation. Ames performed construction prior to January 2019 when Tezak was <br /> contracted to complete construction of the Squaw Gulch VLF Phase 2A facility. The majority of <br /> the earthworks construction to the extent of the finished subgrade elevation below the SLF was <br /> performed by Ames concurrently with their Squaw Gulch VLF Phase 1 work. Construction <br /> activities were performed by Tezak allowing for finishing of the subgrade prior to approval for <br /> SLF placement and the continuation of the Phase 2A Part 1 construction. The term "contractor" <br /> within this report applies to both Ames and Tezak for the time periods explained above. <br /> Equipment used to perform these activities is listed below: <br /> CAT 14 Motor Grader CAT 993 Loader <br /> CAT 163 Motor Grader John Deere 744k Loader <br /> CAT D6 Low Ground Pressure (LGP) Dozer Komatsu PC78MR-6 <br /> CAT D6 LGP Dozers equipped with Global Komatsu WA470 Loader <br /> Positioning System (GPS) CAT CS56 Smooth Drum Compactor <br /> CAT D7 LGP Dozer CAT CP56 Sheepsfoot Drum Compactor <br /> CAT D8 Dozer CAT CS76 Smooth Drum Compactor <br /> CAT D10 Dozer CAT 308 Excavator <br /> John Deere 950 Dozer CAT 312 Excavator <br /> CAT 259 Skid steer CAT 320 Excavator <br /> CAT 279 Skid steer CAT 329 Excavator <br /> CAT 289 Skid steer CAT 330 Excavator <br /> Bobcat Skid steer CAT336 Excavator w/ Roller Attachment <br /> CAT IT28 Loader CAT 345 Excavator <br /> CAT 928 Loader CAT 470 Excavator <br /> CAT 966 Loader John Deere 35 Excavator <br /> CAT 980 Loader John Deere 850 Excavator <br /> CAT 988 Loader CAT 730 Haul Trucks <br /> CAT 992 Loader <br /> P:\Projects\0106.032 VLF2 Phase 2 COA\J-REPORTS\Cert Report-Phase 2A Part 1\DRMS Comments\475.0106.032 CCV PHASE 2A Part 1 <br /> ROC REPORT_Revl.docx <br /> Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.