Laserfiche WebLink
Civil Resources LLC <br /> August 21, 2019 <br /> Pa`,e 3 of <br /> how? If the existing slope has not been verified to be 3:1 or flatter, please re-run the analysis <br /> utilizing more conservative value that would be representative of un-reclaimed mine slopes of <br /> 1.5:1 H:V. If the existing setback cannot be shown to meet the required factor of safety under <br /> these conditions, the permittee will need to commit to immediately backfilling the existing Cell 2 <br /> shoreline to a stable slope/distance in the area adjacent to the overhead power line within 30 <br /> days. (3:1 slope or flatter as shown in the provided analysis, or a minimum 55' offset from the <br /> powerline as demonstrated by the original stability analysis) <br /> This concludes the Division's second adequacy review of this application. This letter shall not be <br /> construed to mean that there are no other technical deficiencies in your application. Other issues may <br /> arise as additional information is supplied. Please remember that the decision date for this amendment <br /> application is September 5, 2019. As previously mentioned, if you are unable to provide satisfactory <br /> responses to any inadequacies prior to this date, it will be your responsibility to request an extension of <br /> time to allow for continued review of this application. If there are still unresolved issues when the <br /> decision date arrives and no extension has been requested, the application will be denied. If you have <br /> any questions, please contact me at (303) 866-3567 x8140. <br /> Sincerely, <br /> e,,, ,�-e <br /> Eric Scott—Environmental Protection Specialist <br />